Plain text version
Field (During Drilling and Sampling)
- [ ] Visual field USCS classification recorded on boring log at time of sampling (color, moisture, consistency, texture)
- [ ] Borderline cases flagged with tentative dual symbol pending lab verification
- [ ] Core box photographs taken with scale bar and core box ID tag, at the owner railroad's required resolution
- [ ] RQD measured and recorded per ASTM D6032 on every core run (Chapter 4.1)
- [ ] Discontinuity spacing, orientation, roughness, and infill noted in rock core log
- [ ] Smear test and dry strength estimated in field for fine-grained soils
Laboratory
- [ ] Moisture content (ASTM D2216) — all split-spoon and Shelby tube samples
- [ ] Atterberg limits (ASTM D4318) — all fine-grained samples and samples with > 10% passing No. 200
- [ ] Sieve analysis (ASTM D6913) — all coarse-grained and mixed samples
- [ ] Hydrometer (ASTM D7928) — all samples with significant fines (> 30% passing No. 200)
- [ ] USCS classification assigned and verified against Casagrande chart
- [ ] AASHTO M 145 classification and GI calculated for all subgrade samples
- [ ] Activity calculated for all CH and MH soils; flag A > 1.25
- [ ] Frost susceptibility class assigned for Class I railroad samples (% finer than 0.02 mm from hydrometer)
- [ ] All lab results entered into gINT per client template or Log*Plot
- [ ] Lab test result table formatted per Appendix B template before submission