↑ Parent Menu⌂ Main Menu
← Chapter 2.2 Soil and Rock Classification
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.2.15 Expansive Clay: Screening by Activity and Estimating Heave

Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…
Authors: Daniel P. Colwell and Mario Ruel
2.2.15 Expansive Clay: Screening by Activity and Estimating Heave

Expansive clay subgrades produce some of the most persistent track geometry problems: seasonal heave and shrinkage under the track, and loss of support along culverts and wall footings. The FHWA's Evaluation of Soil and Rock Properties (GEC 5, Section 7.3) sets out the approach. Clays with PI below 15 generally do not swell. Above that, clay content and activity are checked, then undisturbed samples are tested in the oedometer for swell and swell pressure (ASTM D4546). Volume change is limited to the active zone, the depth over which moisture changes with the seasons. Skempton's activity, PI divided by the percentage finer than 0.002 mm, points to the clay mineral: about 0.3 to 0.5 for kaolinite, 0.5 to 1.2 for illite and 1.5 to 7 for montmorillonite (Das Table 4.1). Das notes that compaction moisture can be chosen to limit swelling and shrinkage.

2.2.15.1 Method

Equation 2.2-16. Activity and heave

A = PI / (% finer than 0.002 mm);   heave ΔH = Σ (swell strain from D4546 at the expected vertical stress × layer thickness within the active zone)
Table 2.2-6. Limitations of one-dimensional swell tests (GEC 5)
LimitationConsequence
Lateral swell and lateral confinement are not reproducedVertical swell may misstate expansion where the soil is not laterally confined, for example behind abutments
Laboratory swell rate does not reflect field water availabilityField heave may develop more slowly, or more completely, than in the test
Long-term swell may continue after primary swellAdd it where the design will have long-term access to water

2.2.15.2 Worked example

A track subgrade has four clay layers extending through a 10 ft active zone. The PIs are 38, 42, 30 and 18, and clay contents are 30 to 50%, giving activities up to 0.84, in the illite range. These inputs are illustrative, not data from a real site. Swell tests at the expected load gave 4.5, 3.2 and 1.5% for the upper three layers. Beneath 2 ft of ballast and subballast, the estimated heave is 2.77 in. Doubling the non-expansive cover to 4 ft takes more clay out of the active zone and lowers it to 2.41 in. Keeping moisture constant also helps: drainage away from the track, sealing ditches, and avoiding trees near the line.

Sample expansive subgrades at the end of the dry season to capture the worst case, and record moisture content with depth on two visits, wet and dry, to locate the bottom of the active zone. Where heave governs, compare replacement depth, moisture barriers and lime treatment (Chapter 7.2) on the heave each one removes.

Open the expansive clay heave calculator →
Activity and likely clay mineral for each layer, the PI screen, heave within the active zone from swell test results, and the effect of non-expansive cover thickness.

2.2.15.3 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.

  • P.J. Sabatini and others, Evaluation of Soil and Rock Properties, FHWA Geotechnical Engineering Circular No. 5: Section 8.3, identification, swell potential and strength of expansive soilsFind source ↗Library entry
  • B.M. Das, Principles of Geotechnical Engineering, 7th edition: Section 4.6 activity (Eq. 4.18, Table 4.1) and compaction of expansive clayFind source ↗
← Previous · 2.0 The Underworld Chapter 2.1 — Track Foundation Elements
Next · 2.0 The Underworld → Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade