2.2.17 Field Soil Descriptions: Word Pictures for Boring Logs

Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…
Authors: Daniel P. Colwell and Mario Ruel
2.2.17 Field Soil Descriptions: Word Pictures for Boring Logs

A boring log is only as useful as its soil descriptions. Laboratory classification (USCS, Section 2.2.4.2) is done on a few samples; every other sample is described in the field from what the driller and the engineer can see and feel. A consistent “word picture” lets the reader of the log, often years later, picture the soil and its behavior: what is the main soil, what else is in it in amounts that change its behavior, how dense or stiff it is, and whether it is natural ground or fill. The system summarized here, a modified Unified description used by a state DOT, is simple enough to apply on the drill rig and maps directly onto the USCS group names.

2.2.17.1 Method

Primary constituent. If more than half the sample passes the #200 sieve it is fine-grained, and the primary constituent is clay or silt by behavior: clay is plastic, rolls to a 1/8-in. thread and is strong when dry; silt is non-plastic, crumbles, and shows water on its surface when the sample is jolted in the hand. Otherwise the soil is coarse-grained and the primary constituent is sand or gravel, whichever is larger, with its size range (fine, medium, coarse) and, where useful, its shape (rounded, angular) written immediately before it. Peat, muck and marl are organic primaries.

Secondary and tertiary constituents. A constituent present in enough quantity to change the behavior is secondary and becomes an adjective before the primary (Silty, Sandy, Gravelly), listed in ascending order of importance. A constituent that is readily seen but does not change the behavior is tertiary and is added at the end as “with ___”. Smaller amounts may be noted as “Trace of ___”.

Table 2.2-7. Constituent limits used in the word picture
ConstituentSecondary (adjective before primary)Tertiary (“with ___”)Trace
Fine-grained (silt, clay)more than 12%5 to 12%less than 5%
Coarse-grained (sand, gravel)more than 30%15 to 29%less than 15%

Strength and descriptors. The strength term comes first: relative density for sand, gravel and silt, consistency for clay. Color, moisture (dry, moist, saturated, judged before the sample is handled) and structure (fissured, laminated, varved, blocky, mottled) follow in ascending order of significance, then the secondary constituents, the size and the primary. “Fill” follows the primary; inclusions such as lenses or layers of another soil are added after the complete description.

Table 2.2-8. Strength terms
Granular termSPT NRelative densityCohesive termCohesion (psf)SPT NManual index
Very Loose< 40–15%Very Soft0–250< 2Extrudes between fingers
Loose4–1015–35%Soft250–5002–4Molded by light finger pressure
Medium Dense10–3035–65%Medium Stiff500–1,0004–8Molded by firm finger pressure
Dense30–5065–85%Stiff1,000–2,0008–15Readily indented by thumb
Very Dense> 5085–100%Very Stiff2,000–4,00015–30Readily indented by thumbnail
Hard4,000–8,000> 30Indented by thumbnail with difficulty

Where no SPT is taken, the system gives a field check for granular soils with a 4-ft, 1.5-in. pigtail auger (pushed in by body weight: very loose; turned in full length easily: loose; stalls near 2.5 ft: medium dense; tight at about 1 ft: dense; only to the length of the spiral: very dense).

2.2.17.2 Worked example

Example 2.2-5: Describing a Split-Spoon Sample from an Embankment Boring

A boring through an embankment on a Class I railroad located in Michigan recovers a split-spoon sample at 12 ft. The engineer estimates the composition by eye and feel, records the blow count and checks plasticity with the thread test.

split-spoon sample at 12 ftN = 9 blows/ftgray-brown, moistfines 60% (plastic), sand 32%, gravel 8%word picture = ?GivenFines ~60%, plastic threadSand ~32%, gravel ~8%N = 9; Gray-Brown; MoistRequiredPrimary, secondary, tertiaryStrength termField description
Split-spoon sample from an embankment boring with the engineer’s field estimates.

Given

VariableValueDescription
Finesabout 60%; rolls to a 1/8-in. thread, strong when dryClay behavior
Sandabout 32%
Gravelabout 8%
N9 blows/ftSPT, 140-lb hammer
ColorGray-Brown
MoistureMoistBefore handling

Required

  • Primary, secondary and tertiary constituents
  • Strength term
  • The complete field description

Equations

  1. Rule 1: Fines > 50% → fine-grained; plastic → Clay — primary
  2. Rule 2: Coarse constituent > 30% → adjective; 15–29% → “with”; < 15% → trace — Table 2.2-7
  3. Rule 3: Cohesive, N = 8–15 → Stiff — Table 2.2-8
  4. Rule 4: Strength, color, moisture, structure, secondary, primary, then with and trace — order

Steps

Step 1 · Primary (Rule 1)
60% passes the #200 sieve; plastic thread
Clay
↓
Step 2 · Secondary and tertiary (Rule 2)
Sand 32% > 30%; gravel 8% < 15%
Sandy; Trace of Gravel
Spot check: Sand at 32% is close to the 30% limit; at 28% the description would read “Clay, with Sand”. The adjective changes the expected behavior, so recheck the estimate if it matters.
↓
Step 3 · Strength (Rule 3)
N = 9 in the 8 to 15 range
Stiff
↓
Step 4 · Assemble (Rule 4)
Stiff + Gray-Brown + Moist + Sandy + Clay + Trace of Gravel
Stiff Gray-Brown Moist Sandy Clay, Trace of Gravel
↓
Solution
Stiff Gray-Brown Moist Sandy Clay, Trace of Gravel.

Solution

Field description: Stiff Gray-Brown Moist Sandy Clay, Trace of Gravel.

The lab will probably classify this sample CL, sandy lean clay (Section 2.2.4.2), consistent with the field description. In railroad embankments, also note cinders, ballast, slag or tie fragments when they appear: they mark old track raises and are the clue to where the original ground surface and the past fouled ballast layers are.

Open the field soil description builder →
Builds the word picture from estimated gravel, sand and fines, fines behavior, size and shape, color, moisture, structure, fill and inclusions, with the strength term from N, su or the manual index tests.

2.2.17.3 Sources

The summaries above are paraphrased in original wording; equations and tabulated values are standard or published. Individual railroads, clients, companies and projects are not named.

  • Michigan Department of Transportation, Uniform Field Soil Classification System (Modified Unified Description), April 2009.Find source ↗
  • ASTM D2488, Practice for Description and Identification of Soils (Visual-Manual Procedure); ASTM D2487, Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System).Official page ↗Library entry