↑ Parent Menu⌂ Main Menu
← Chapter 2.2 Soil and Rock Classification
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.2.7 Frost Susceptibility Classification

Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…
Authors: Daniel P. Colwell and Mario Ruel
2.2.7 Frost Susceptibility Classification

For Class I railroad mainline located in the prairies and Class I railroad operations located in Canada, frost susceptibility is a primary classification criterion. The U.S. Army Corps of Engineers frost susceptibility classification:

FS ClassDescriptionFrost Heave Risk
FS-0Non-frost-susceptibleNegligible
FS-1Slightly frost-susceptibleSlight
FS-2Moderately frost-susceptibleModerate
FS-3Moderately to highly frost-susceptibleHigh
FS-4Very highly frost-susceptibleVery High

This manual labels the USACE frost groups FS-0 (NFS) and FS-1 to FS-4 (F1 to F4). Key criteria: GW, GP, SW, SP with < 3% finer than 0.02 mm = FS-0. All silts (ML, MH) = FS-4. Clays with PI > 12 = FS-3; lean clays with PI < 12 and varved clays = FS-4. In cold regions, assign a frost susceptibility class to all subgrade materials; Use a frost index analysis (freezing degree-days) together with the frost susceptibility class to set the minimum non-frost-susceptible ballast and subballast thickness.

Supplemental reference

USACE frost groups by percent finer than 0.02 mm

The standard USACE groups (1965), which the FS classes above correspond to, are defined by the percent finer than 0.02 mm (20 μm), not the No. 200 sieve:

GroupSoils
NFSAll soils with < 3% finer than 0.02 mm
F1Gravelly soils with 3–10% finer than 0.02 mm
F2Gravelly soils with 10–20% finer; sands with 3–15% finer than 0.02 mm
F3Gravelly soils > 20% finer; sands (except very fine silty sands) > 15% finer; clays with PI > 12
F4All silts; very fine silty sands > 15% finer; lean clays with PI < 12; varved clays and other banded fine-grained sediments

Susceptibility increases from F1 to F4. Carter and Bentley note that kaolinitic clays tend to heave more than montmorillonitic clays because water is more mobile in non-expanding clay structures — a counter-intuitive point when CH subgrade is assumed to be low frost risk. A quick screen (TRRL, 1970): granular soil with < 10% passing No. 200 is not susceptible; granular soil with > 10% fines or cohesive soil with PI < 20 is susceptible; cohesive soil with PI > 20 is not.

Confirm the frost-susceptibility classification with a hydrometer test, because the percent finer than 0.02 mm cannot be read from a sieve analysis.

Source: Carter, M. and Bentley, S. P. (2016). Soil Properties and their Correlations, 2nd ed. Wiley

Frost susceptibility in the UIC framework

Profillidis ranks silt as very frost-susceptible, clay as susceptible, and sand and gravel as not susceptible. Frost susceptibility is the third subgrade parameter, after soil class and hydrogeology, in climates where freezing is frequent. Protection is sized with the frost index ( Chapter 2.3, Section 2.3.5.3 ).

After Profillidis (2014), §9.4, §9.11.1. Full reference under Supplemental References.

← Previous · 2.0 The Underworld Chapter 2.1 — Track Foundation Elements
Next · 2.0 The Underworld → Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade