Atterberg limits define the moisture content boundaries between soil behavioral states for fine-grained soils. They are measured on the fraction passing the No. 40 sieve.

No additional content.
PI = LL − PL
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| PI | plasticity index = LL − PL | Lab test | PI = LL − PL from Atterberg limits (ASTM D4318). | CL 7–30, CH 25–80 · by USCS group |
| LL | liquid limit | Lab test | Atterberg limits (ASTM D4318) on the minus No. 40 fraction. | CL 20–50, CH 50–110 · by USCS group |
LI = (w_n − PL) / PI
Where w_n = natural (field) water content (%). Interpretation:
| LI | Consistency State |
|---|---|
| < 0 | Stiff / desiccated |
| 0–0.25 | Very stiff |
| 0.25–0.50 | Stiff |
| 0.50–0.75 | Medium |
| 0.75–1.00 | Soft |
| > 1.00 | Very soft / approaching liquid state |
Activity (A) — clay mineralogy indicator:
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| wn | natural (field) water content (%) | Lab test | Oven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938). | gravels/sands 3–25%, clays 15–70% · by USCS group |
| PI | plasticity index | Lab test | PI = LL − PL from Atterberg limits (ASTM D4318). | CL 7–30, CH 25–80 · by USCS group |
A = PI / (% clay fraction)
Where % clay fraction = % finer than 0.002 mm from hydrometer analysis.
| A | Clay Mineral Type |
|---|---|
| < 0.75 | Inactive (kaolinite dominant) |
| 0.75–1.25 | Normal (illite dominant) |
| > 1.25 | Active (montmorillonite / smectite) |
Activity > 1.25 is a critical flag on all railroad projects: highly active clays exhibit significant swell potential when wetted after desiccation — a chronic track geometry problem along Class I railroad subdivision located in the Carolinas, Class I railroad routes located in the Texas Panhandle, and the railroad's expansive clay zones in Wyoming and Colorado. Consider swell testing (ASTM D4546) when A > 1.0.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| PI | plasticity index | Lab test | PI = LL − PL from Atterberg limits (ASTM D4318). | CL 7–30, CH 25–80 · by USCS group |
The shrinkage limit (ASTM D4943) is the water content below which further drying causes no volume change. For railroad embankments in seasonally dry climates (Class I railroad located in the Great Plains, Class I railroads located in the Southwest and the Canadian Prairies), SL data inform desiccation crack depth estimates used in slope stability models (Chapter 6.3).
Table 8-S3. Typical Atterberg limits for clay minerals (Carter & Bentley, Table 2.2.2)
| Mineral | PL (Ca++) | LL (Ca++) | PL (Na+) | LL (Na+) | Typical activity |
|---|---|---|---|---|---|
| Montmorillonite | 65–79 | 123–177 | 86–97 | 280–700 | Ca 1.5; Na 7.2 |
| Illite | 36–42 | 69–100 | 34–41 | 61–75 | 0.9 |
| Kaolinite | 26–36 | 34–73 | 26–28 | 29–52 | 0.33–0.46 |
Table 8-S4. Swelling potential from plasticity index (Carter & Bentley, Table 2.2.4)
| Swelling potential | PI (Seed et al., 1962) | PI (Krebs & Walker, 1971) |
|---|---|---|
| Low | 0–15 | 0–15 |
| Medium | 10–30 | 15–24 |
| High | 20–55 | 25–46 |
| Very high | > 40 | > 46 |
Table 8-S5. Expansion potential from shrinkage limit and linear shrinkage (after Altmeyer, 1955)
| Potential | Shrinkage limit (%) | Linear shrinkage (%) |
|---|---|---|
| Critical | < 10 | > 8 |
| Marginal | 10–12 | 5–8 |
| Non-critical | > 12 | < 5 |
Swelling potential here is the percent swell of a laterally confined specimen compacted at optimum moisture (standard Proctor) and soaked under a 1 psi surcharge: 0–1.5% low, 1.5–5% medium, 5–25% high, > 25% very high. Seed et al. (1962) related it to plasticity as S = 60K·PI2.44 with K = 3.6 × 10−5, valid for clay contents of 8–65% and accurate to about ±33% of lab values. Because each index is uncertain, Holtz and Gibbs (adopted by USBR) recommend judging expansion potential from colloid content, PI and shrinkage limit together, then confirming with an ASTM D4546 swell test where the result matters for track geometry.
Source: Carter, M. and Bentley, S. P. (2016). Soil Properties and their Correlations, 2nd ed. Wiley
For large corridor programs, NYSDOT’s GTM-7 (based on AASHTO T 89) allows a one-point liquid limit: accept a trial that closes the groove in 15–30 drops, with at least two consistent consecutive closures, then LL = w (N/25)0.12. The factor ranges from 0.941 at 15 drops to 1.022 at 30 drops. Reserve multi-point flow curves for design-critical samples and borderline A-line soils.
Source: New York State DOT Geotechnical Engineering Bureau (2015). Test Method for Liquid Limit, Plastic Limit, and Plasticity Index, GTM-7 Rev. 2