↑ Parent Menu⌂ Main Menu
← Chapter 2.2 Soil and Rock Classification
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.2.5 AASHTO M 145 Classification

Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…
Authors: Daniel P. Colwell and Mario Ruel
2.2.5 AASHTO M 145 Classification

The AASHTO classification (AASHTO M 145) is used specifically for pavement subgrade evaluation and is the primary soil classification system referenced by many owner railroads for track subgrade rehabilitation projects. It classifies soils into Groups A-1 through A-7 based on gradation and Atterberg limits.

AASHTO Soil Classification for Pavement Design
AASHTO Soil Classification for Pavement Design
TxDOT Soil Classes C1–C4 for Embankment and Subgrade
TxDOT Soil Classes C1–C4 for Embankment and Subgrade
Table 2.2-1. AASHTO M 145 Classification Summary (Abbreviated)
Group% Pass No. 200LLPITypical USCSSubgrade Rating
A-1-a≤ 15—≤ 6GW, GPExcellent
A-1-b≤ 25—≤ 6SW, SP, GMExcellent
A-2-4≤ 35≤ 40≤ 10GM, GC, SMGood
A-2-6≤ 35≤ 40> 10GC, SCGood-Fair
A-3≤ 10NPNPSPGood
A-4> 36≤ 40≤ 10ML, OLFair
A-5> 36> 40≤ 10MH, OHFair-Poor
A-6> 36≤ 40> 10CLPoor
A-7-5> 36> 40≤ LL − 30MH, CHPoor
A-7-6> 36> 40> LL − 30CHVery Poor

Group Index (GI) — quantifies subgrade quality within a group:

Equation 2.2-10 — Group Index:

GI = (F − 35) × [0.2 + 0.005(LL − 40)] + 0.01(F − 15)(PI − 10)

Where:

  • F = percent passing No. 200 sieve (%)
  • LL = liquid limit (%)
  • PI = plasticity index (%)
  • GI is rounded to the nearest whole number and reported as 0 if negative. GI = 0 for A-1-a, A-1-b, A-2-4, A-2-5 and A-3; for A-2-6 and A-2-7 use only the PI term, 0.01(F − 15)(PI − 10)

GI = 0 indicates good subgrade material, and higher values indicate poorer material. AASHTO M 145 sets no upper limit; highly plastic clays can exceed 20. A high group index (GI ≥ 12 is a common trigger) warrants a ground improvement evaluation (Chapter 7.2) for track subgrade.

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
GIintermediate value computed on this pageAnother equationComputed: GI = (F − 35) × [0.2 + 0.005(LL − 40)] + 0.01(F − 15)(PI − 10)project-specific
Fpercent passing NoLab testPercent passing No. 200 sieve: washed sieve analysis (ASTM D1140 / D6913).clean < 5%; with fines > 12% · by USCS group
LLliquid limit (%)Lab testAtterberg limits (ASTM D4318) on the minus No. 40 fraction.CL 20–50, CH 50–110 · by USCS group
PIplasticity index (%)Lab testPI = LL − PL from Atterberg limits (ASTM D4318).CL 7–30, CH 25–80 · by USCS group
← Previous · 2.0 The Underworld Chapter 2.1 — Track Foundation Elements
Next · 2.0 The Underworld → Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade