↑ Parent Menu⌂ Main Menu
← Chapter 2.2 Soil and Rock Classification
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

Empirical Equations — Use and Limitations

Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…
Authors: Daniel P. Colwell and Mario Ruel
Empirical Equations — Use and Limitations

The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.

IDCorrelationGives
IS-25Field vane strength correctionSᵤ (field)
IX-10Undrained strength from liquidity indexSᵤ (remolded)
RK-01Rock Mass Rating (RMR₈₉)RMR
RK-02Rock mass quality (Q-system)Q
RK-05GSI from RMR₈₉GSI
IX-01Compression index from liquid limit (undisturbed)C꜀
IX-04Compression index from plasticity indexC꜀
RK-03RMR–Q conversionRMR ↔ Q
RK-04RQD from volumetric joint countRQD
RK-10UCS from point load indexσ꜀
← Previous · 2.0 The Underworld Chapter 2.1 — Track Foundation Elements
Next · 2.0 The Underworld → Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade