2.2.13 Practice Questions
Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…
Each question is worked in the same five parts as the examples. Try it from the Given and Required before opening the steps. Question 2.2-5 is a reasoning question, so its steps are a chain of decisions rather than equations.
Question 2.2-1: Classify a High-Plasticity Clay
Problem Statement
A sample from the foundation of a Class I railroad embankment that is to be raised for a new grade has the gradation, Atterberg limits and water content shown. The engineer must classify the soil in both the USCS and AASHTO systems, find its liquidity index, and say what the results mean for carrying the added embankment load.
Given and required for Question 2.2-1.
Given
Variable
Value
Description
F
71%
Percent passing No. 200
LL
56%
Liquid limit
PL
24%
Plastic limit
wn
41%
Natural water content
Required
(a) USCS group
(b) AASHTO group and GI
(c) Liquidity index and consistency
Equations
Eq. 2.2-5: PI = LL − PL — plasticity index
Eq. 2.2-8: PIA = 0.73 (LL − 20) — A-line: PI above it plots as clay (C), below as silt (M)
Eq. 2.2-6: LI = (wn − PL) / PI — liquidity index
Eq. 2.2-10: GI = (F − 35)[0.2 + 0.005(LL − 40)] + 0.01(F − 15)(PI − 10) — AASHTO group index; F = percent passing No. 200; a negative GI is reported as 0
Spot check: AASHTO M 145 sets no upper limit on GI, so 22 is reported as computed.
↓
Step 6 · LI (Eq. 2.2-6)
LI = (41 − 24) / 32 = 17 / 32
LI = 0.53: medium consistency
↓
Solution
(a) CH; (b) A-7-6 (22); (c) LI = 0.53, medium.
Solution
(a) CH, fat clay. (b) A-7-6, GI = 22. (c) LI = 0.53, medium consistency.
The soil is highly plastic but not near its liquid limit, so it is not in an unstable state today. A GI of 22 is a very poor subgrade rating, and a fat clay foundation will consolidate under fill. Any embankment load over about 3 ft of fill warrants a settlement and ground improvement assessment (Chapters 6.2 and 7.2).
Question 2.2-2: Gradation Coefficients and the Dual Symbol
Problem Statement
A Class I railroad is building a new yard lead and wants to know whether the sand exposed at subgrade level can stay in place. A gradation test gave the grain sizes shown, with 9% non-plastic fines. The engineer must find the gradation coefficients, assign the USCS symbol, and comment on the sand as a track subgrade.
Given and required for Question 2.2-2.
Given
Variable
Value
Description
D10
0.003 in.
Grain size at 10% passing
D30
0.019 in.
Grain size at 30% passing
D60
0.090 in.
Grain size at 60% passing
F
9%
Fines content
LL
NP
Fines are non-plastic
Required
Cu and Cc
USCS dual symbol
Equations
Eq. 2.2-2: Cu = D60 / D10
Eq. 2.2-3: Cc = D30² / (D10 D60) — SW: Cu ≥ 6 and 1 ≤ Cc ≤ 3
Steps
Step 1 · Cu
0.090 / 0.003
Cu = 30.0 ≥ 6: passes
↓
Step 2 · Cc
0.019² / (0.003 × 0.090) = 0.000361 / 0.000270
Cc = 1.34, between 1 and 3: passes
Spot check: The units cancel, so the ratio can be taken in inches without converting.
↓
Step 3 · Dual symbol
Well graded; fines 9% (5 to 12%); NP
SW-SM
↓
Solution
SW-SM, well-graded sand with silt.
Solution
Cu = 30.0 and Cc = 1.34; the sand is well graded. With 9% non-plastic fines it is SW-SM, well-graded sand with silt.
SW-SM is generally a suitable subgrade material. Its performance depends on compaction, so density is verified during construction (Chapter 5.3).
Question 2.2-3: Correcting Vane Shear Strength and Screening Activity
Problem Statement
A railroad embankment over soft plastic clay is to be checked for stability before a speed increase. Field vane tests gave the strength shown, and laboratory tests gave the plasticity index and clay fraction. The engineer must correct the vane strength for use in the stability analysis and screen the clay for swell potential.
Field vane shear tests overestimate the strength of plastic clays mobilized in an embankment failure, so the vane value is reduced by Bjerrum’s factor. The same sample’s activity screens it for swell.
Given and required for Question 2.2-3: field vane strength and Bjerrum correction.
Spot check: A above 1.25 is classed active; smectite (montmorillonite) is likely.
↓
Solution
(a) su = 356 psf; (b) A = 1.37, active.
Solution
(a) Corrected su = 0.178 tsf (356 psf). (b) A = 1.37, an active clay.
Using the uncorrected vane value would overstate the strength by about 19%. The activity says the clay mineral is probably smectite, so swell testing (ASTM D4546) is warranted before the subgrade or any structure is designed. Both the corrected strength and the swell data belong in the geotechnical report (Chapter 8.4).
Question 2.2-4: Rock Mass Rating for a Tunnel
Problem Statement
A passenger rail corridor is studying a short tunnel to replace a sharp curve around a ridge. A 10-ft core run from the feasibility boring gave the rock strength, RQD, joint spacing and condition shown, in a dry hole with joints favorably oriented for tunneling. The engineer must compute the rock mass rating and class for the tunnel feasibility report.
A 10-ft core run from a tunnel feasibility study on a passenger corridor. The same six RMR ratings are used as for a slope, but the orientation adjustment is taken from the table for tunnels.
For a tunnel the orientation adjustment is small when the joints are favorable, so the rating is governed by the rock itself. If the owner’s criterion for unsupported spans is, say, RMR of 60 or more, this rock meets it. A Q-system check is still recommended before tunnel support recommendations are finalized, because the two systems weigh joint sets and stress differently.
Question 2.2-5: Frost Susceptibility of a Silt Subgrade
Problem Statement
A Class I railroad located in Manitoba is rebuilding a main track that heaves every winter. The subgrade is a silt with the fines content shown, in a climate with deep seasonal frost. The engineer must assign the frost susceptibility group and explain what it means for the depth of non-frost-susceptible material above the subgrade.
A subgrade sample from a Class I railroad located in Manitoba. Frost susceptibility is assigned from the soil type and the percentage finer than 0.02 mm, and it decides how much non-frost-susceptible material must sit above the subgrade.
Given and required for Question 2.2-5.
Given
Variable
Value
Description
USCS
ML
Silt
% finer than 0.02 mm
18%
Fines in the frost-critical size range
Climate
About 50°N
Deep seasonal frost
Required
USACE frost group
Practical implication for track design
Equations
No equation is needed; the answer follows from the criteria listed under Given.
Steps
Step 1 · Is the soil frost-susceptible?
18% finer than 0.02 mm > 3%
Yes
↓
Step 2 · Which group?
All silts (ML, MH) are grouped F4 once they are frost-susceptible
F4, the most frost-susceptible group
↓
Step 3 · What does design need?
Freezing index for the site; a non-frost-susceptible granular layer over the subgrade, thick enough for the freeze depth; geometry monitoring after construction.
↓
Solution
F4: provide non-frost-susceptible cover sized by a freeze-depth calculation.
Solution
USACE group F4, the most frost-susceptible group.
Silt with water available is the material that heaves most and loses most strength on thaw (Section 3.8.8). Document the frost group in the geotechnical data report, determine the site freezing index, and provide a non-frost-susceptible (NFS) granular subballast over the subgrade with its thickness set by a site-specific freeze-depth calculation, such as the modified Berggren equation (Chapter 7.3). Track geometry should be monitored (Chapter 5.3) through the first few freeze-thaw cycles after construction.
Empirical equation note · this section
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
IS-25 Field vane strength correctionSᵤ (field)Use: Soft clays, embankment stability on soft ground; based on back-analyzed failures. Typical PI 5–100%. Limits: Not applicable to fissured, varved, or organic clays without local calibration. Scatter about ±25%.
IX-10 Undrained strength from liquidity indexSᵤ (remolded)Use: Remolded clays; anchored at Su ≈ 35 psf at LL and ≈ 3,550 psf at PL. Limits: Remolded strength only; intact strength is higher by the sensitivity. Rough estimate.
RK-01 Rock Mass Rating (RMR₈₉)RMRUse: Jointed rock masses; tunnels, foundations; slopes via SMR (RK-06). Limits: Mixed versions (1976 vs 1989) give different values; state which is used.
RK-02 Rock mass quality (Q-system)QUse: Underground excavations; range 0.001–1000. Limits: Developed for tunnels; SRF and Jw are not directly meaningful for slopes. Use RQD ≥ 10 in calculation.