2.2.14 Case Studies

Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…
Authors: Daniel P. Colwell and Mario Ruel
2.2.14 Case Studies

Field case studies by Burt G. Look, from Earthworks: Theory to Practice – Design and Construction (CRC Press/Balkema, 2023), chosen for this chapter’s topics. Each is summarized from the book with its key figures and a closing note on railroad application added by the authors of this manual. Credit for the case material belongs to Look; see item S13 under Supplemental References.

Case Study 8.14.1 — Gradings before and after compaction: the oversize that was never tested
Case study · Look (2023) §4.6

Related section: 2.2.2 Grain-Size Analysis

On a cut-to-fill earthworks job, rocks up to 24 in were visible and many particles exceeded 10 in, yet four of five grading certificates gave 6 in as the maximum size. Look calls this survivorship bias: the large pieces are left behind when the sample is taken, so they never appear in the result. Visual observation should always be part of the assessment.

Averaged gradings before and after compaction with two 19-ton vibrating rollers were similar to each other but clearly different from the pre-compaction gradings, because rolling breaks the material down. A specification limiting fines to 7% passing the No. 200 sieve would pass this material before compaction and fail it after. Since performance depends on the compacted state there is a case for post-compaction testing; since roller type and size change the result there is a case for pre-compaction testing. Either way, the specification has to say which.

For railroad work: the same question arises for subballast and granular fill acceptance. State in the special provision whether gradation is tested at the source, on the stockpile, or after placement and compaction.

Stockpile on a cut-to-fill job with a 24 in. rock; most gradings reported 6 in. as the largest size.
Figure 8-LK1. Stockpile on a cut-to-fill job with a 24 in. rock; most gradings reported 6 in. as the largest size. Source: Look (2023), Figure 4.7-1, p. 115.

Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §4.6, pp. 114. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.

Case Study 8.14.2 — Representative sampling from a weathered-rock stockpile
Case study · Look (2023) §5.9

Related section: 2.2.2 Grain-Size Analysis

Four stockpile samples of extremely to slightly weathered sandstone/siltstone all reported 100% passing 1½ in., yet rocks up to 12 in were visible in the pile. After rolling, 24 post-compaction gradings gave a maximum particle size under 3 in for both roller types, while the embankment surface still showed 12 in. pieces. The “increase” in coarse fraction after compaction is an artefact of the biased pre-compaction samples. Fines rose only slightly, from 10% to about 11%, although rolling visibly broke down the large weathered particles.

Look’s conclusion is that the industry places misplaced confidence in test certificates as proof that a material specification has been met.

Table 8-LK1. Average gradings of XW–SW sandstone/siltstone, % passing (after Look 2023, Table 5.7)

SievePre-compaction (n = 4)Smooth drum (n = 12)Padfoot (n = 12)
3 in.100.0100.0100.0
1½ in.100.082.880.3
¾ in.75.565.461.8
No. 833.025.023.9
No. 4027.021.620.4
No. 20010.011.110.8
Oversize (> 12 in.) extremely to slightly weathered interbedded rock in the stockpile, absent from the test samples.
Figure 8-LK2. Oversize (> 12 in.) extremely to slightly weathered interbedded rock in the stockpile, absent from the test samples. Source: Look (2023), Figure 5.9-2, p. 145.

Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §5.9, pp. 142–144. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.