Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it
2.2.9 Worked Examples
Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…
The three examples take a sample from laboratory data to a classification in five parts: what is known (Given), what is wanted (Required), the equations, a flow chart of the steps in the order they are solved with a spot check at each step, and the solution with what it means for the track. The flow charts follow the same path as the ASTM D2487 decision sequence of Table 1.3-4: coarse or fine first, then gradation or plasticity, then the modifiers.
Example 2.2-1: USCS and AASHTO Classification of a Fine-Grained Soil
A sample from a bridge approach on a Class I railroad located in the Appalachians was recovered at 12 to 14 ft. Classification is the first thing done with any sample, because the group symbol tells the engineer which strength, compressibility and frost behavior to expect before any other test is run. This example takes the sample through both systems the manual uses: USCS for engineering behavior and AASHTO M 145 for subgrade rating.
Given and required for Example 2.2-1: the sample on the plasticity chart.
Eq. 2.2-8: PIA = 0.73 (LL − 20) — A-line: PI above it plots as clay (C), below as silt (M)
Eq. 2.2-6: LI = (wn − PL) / PI — liquidity index
Eq. 2.2-10: GI = (F − 35)[0.2 + 0.005(LL − 40)] + 0.01(F − 15)(PI − 10) — AASHTO group index; F = percent passing No. 200; a negative GI is reported as 0
Steps
Step 1 · Coarse or fine-grained?
Uses: F
62% passing No. 200 ≥ 50%
Fine-grained
Spot check: More than half the sample passes the No. 200 sieve.
↓
Step 2 · Plasticity index PI (Eq. 2.2-5)
Uses: LL, PL
PI = 48 − 21
PI = 27%
↓
Step 3 · A-line value PIA (Eq. 2.2-8)
Uses: LL
PIA = 0.73 × (48 − 20) = 0.73 × 28
PIA = 20.4%; PI = 27% is above the A-line: clay (C)
Spot check: 0.73 × 28 = 20.44.
↓
Step 4 · Plasticity: low or high?
Uses: LL
LL = 48% < 50%
Low plasticity (L): CL, lean clay
↓
Step 5 · Liquidity index LI (Eq. 2.2-6)
Uses: wn, PL, PI
LI = (33 − 21) / 27 = 12 / 27
LI = 0.44: stiff to medium consistency
Spot check: LI between 0 and 1 means the water content lies between the plastic and liquid limits; 0.44 is in the lower half.
↓
Step 6 · AASHTO group
Uses: F, LL, PI
F = 62% > 35% (silt-clay); LL = 48 > 40; PI = 27 > 10 ⇒ A-7; PI = 27 > LL − 30 = 18 ⇒ A-7-6
Spot check: First term 27 × 0.24 = 6.48; second term 0.47 × 17 = 7.99.
↓
Solution
CL, lean clay; LI = 0.44; A-7-6 (14).
Solution
USCS: CL, lean clay. AASHTO: A-7-6 with GI = 14. LI = 0.44, stiff to medium.
Both systems say the same thing in different words: a plastic, fine-grained soil that will lose strength when wet and make a poor subgrade. A group index of 14 places it near the bottom of the AASHTO rating. On a bridge approach this sample sets up a CBR evaluation (Chapter 7.3) and a check of whether ground improvement is needed (Chapter 7.2).
Example 2.2-2: USCS Classification of a Sand From Sieve Data
Subgrade fill is being evaluated for a new intermodal yard on a Class I railroad located in the Midwest. For coarse-grained soils the classification rests on the shape of the grain-size curve, so the sieve results are read at three points, D10, D30 and D60, to decide whether the sand is well or poorly graded.
Given and required for Example 2.2-2: sieve results and characteristic sizes.
Given
Variable
Value
Description
% passing 1 in., No. 4, No. 10, No. 40, No. 200
100, 88, 74, 42, 7
Sieve analysis
D10
0.087 mm (0.0034 in.)
Interpolated on a log scale from the sieve data
D30
0.23 mm (0.0092 in.)
As above
D60
1.02 mm (0.040 in.)
As above
LL, PL
Non-plastic (NP)
Atterberg limits of the fines
Required
USCS group symbol and name
AASHTO group
Equations
Rule: F < 50% ⇒ coarse-grained; F of 5 to 12% ⇒ dual symbol — ASTM D2487
Eq. 2.2-2: Cu = D60 / D10 — coefficient of uniformity
Eq. 2.2-3: Cc = D30² / (D10 D60) — coefficient of curvature; SW requires Cu ≥ 6 and 1 ≤ Cc ≤ 3
Steps
Step 1 · Coarse or fine-grained?
7% passing No. 200 < 50%
Coarse-grained
↓
Step 2 · Gravel or sand?
Uses: % passing No. 4 and No. 200
Gravel = 100 − 88 = 12%; sand = 88 − 7 = 81%
Sand (S): 81 / 93 = 87% of the coarse fraction
Spot check: 12 + 81 + 7 = 100%.
↓
Step 3 · Fines
7% fines is between 5 and 12%; fines are NP
Dual symbol needed, with M for the non-plastic fines
USCS: SP-SM, poorly graded sand with silt. AASHTO: A-1-b, GI = 0.
Poorly graded here means the curve has a gap or a flat step in the middle (Cc below 1), not that the sand is unsuitable. It drains, it is non-plastic and it rates at the top of the AASHTO scale. It is generally acceptable as yard subgrade without ground improvement, subject to proof-roll acceptance during construction (Chapter 5.3).
Example 2.2-3: Rock Mass Rating of a Rock Cut
A rock cut on a Class I railroad located in the mountains of British Columbia is being evaluated from NQ core and face mapping. The Rock Mass Rating (Bieniawski 1989) adds six ratings: five for the rock and its joints, and one adjustment for how the joints are oriented relative to the cut. The example shows how much that last term can matter.
Given and required for Example 2.2-3: rock cut, core and joint data.
Basic RMR = 63, Class II (good rock). With the slope orientation adjustment, RMR = 38, Class IV (poor rock).
The 25-point adjustment is larger than any single rock property rating except joint condition, so the cut is controlled by how its joints are oriented, not by the quality of the rock. That points the next step toward a kinematic analysis (Chapter 6.3) and the Slope Mass Rating (Romana), which treats the slope orientation in more detail, and toward pattern bolting as a likely remedy. Production blasting damages the rock near the face; a disturbance factor D = 0.7 should be used in any Hoek-Brown strength estimate.
Empirical equation note · this section
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
IX-10 Undrained strength from liquidity indexSᵤ (remolded)Use: Remolded clays; anchored at Su ≈ 35 psf at LL and ≈ 3,550 psf at PL. Limits: Remolded strength only; intact strength is higher by the sensitivity. Rough estimate.