↑ Parent Menu⌂ Main Menu
← Chapter 2.2 Soil and Rock Classification
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

Author and Sources

Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…
Authors: Daniel P. Colwell and Mario Ruel
Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

Primary sources

Supplemental references

  • Sabatini, P. J. et al. (2002). Evaluation of Soil and Rock Properties. Geotechnical Engineering Circular No. 5, FHWA-IF-02-034 (superseded by GEC 5, Geotechnical Site Characterization, FHWA-NHI-16-072 (2017))Find source ↗Library entry
  • Carter, M. and Bentley, S. P. (2016). Soil Properties and their Correlations, 2nd ed. WileyFind source ↗Library entry
  • New York State DOT Geotechnical Engineering Bureau (2015). Test Method for Liquid Limit, Plastic Limit, and Plasticity Index, GTM-7 Rev. 2Find source ↗
  • U.S. Bureau of Reclamation (1998). Engineering Geology Field Manual, 2nd ed., Vol. IFind source ↗Library entry
  • U.S. Army Corps of Engineers (2001). Geotechnical Investigations. EM 1110-1-1804Official page ↗
  • Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §4.6, §5.9Find source ↗Library entry

File locations for these documents are listed under Supplemental References.

← Previous · 2.0 The Underworld Chapter 2.1 — Track Foundation Elements
Next · 2.0 The Underworld → Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade