2.2.2 Grain-Size Analysis

Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…
Authors: Daniel P. Colwell and Mario Ruel
2.2.2 Grain-Size Analysis
2.2.2.1 Sieve Analysis (ASTM D6913)

Sieve analysis separates soil particles by mechanical sieving through a standardized stack of sieves. Key sieves and particle size boundaries:

Sieve Analysis Test
Sieve Analysis Test
Soil Deposits and Grain Size Analysis
Soil Deposits and Grain Size Analysis
SieveOpening (in.)Particle Class Boundary
3 in.3.00Coarse gravel / cobble
¾ in.0.75Fine gravel / coarse gravel
No. 40.187Gravel / sand boundary
No. 100.079Coarse / medium sand
No. 400.0165Medium / fine sand
No. 2000.0029Sand / fines boundary
Equation 2.2-1 — Percent Passing (by mass):

P_i (%) = [Mass passing sieve i / Total dry mass of specimen] × 100

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
Pi (%)[Mass passing sieve i / Total dry mass of specimen] × 100Lab testGrain-size curve: sieve (ASTM D6913) plus hydrometer for fines (ASTM D7928). Read D10, D30, D50, D60, D85 from the curve.by USCS group
Equation 2.2-2 — Coefficient of Uniformity:

C_u = D_60 / D_10

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
CuD_60 / D_10Lab testGrain-size curve: sieve (ASTM D6913) plus hydrometer for fines (ASTM D7928). Read D10, D30, D50, D60, D85 from the curve.by USCS group
Equation 2.2-3 — Coefficient of Curvature:

C_c = (D_30)² / (D_10 × D_60)

Where D_10, D_30, D_60 = grain diameter (mm or in.) at which 10%, 30%, and 60% of the soil mass is finer, respectively.

Grain shape descriptors for coarse-grained soil: (a) rounded, (b) subrounded (continued on following sheet in source with subangular and angular).
Supplemental Figure 8-S3. Grain shape descriptors for coarse-grained soil: (a) rounded, (b) subrounded (continued on following sheet in source with subangular and angular). Source: U.S. Army Corps of Engineers (2001). Geotechnical Investigations. EM 1110-1-1804.

Gravel classification: Well-graded gravel (GW) requires C_u ≥ 4 and 1 ≤ C_c ≤ 3. Poorly graded gravel (GP) fails either criterion. Sand classification: Well-graded sand (SW) requires C_u ≥ 6 and 1 ≤ C_c ≤ 3. Poorly graded sand (SP) fails either criterion.

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
Cc(D_30)² / (D_10 × D_60)Lab testGrain-size curve: sieve (ASTM D6913) plus hydrometer for fines (ASTM D7928). Read D10, D30, D50, D60, D85 from the curve.by USCS group
2.2.2.2 Hydrometer Analysis (ASTM D7928)

For the fines fraction (passing No. 200 sieve), hydrometer analysis gives the percent finer than each particle size, including the clay-size fraction finer than 0.002 mm (2 µm). The hydrometer reading at elapsed time t is converted to equivalent particle diameter using Stokes' Law:

Hydrometer Analysis
Hydrometer Analysis
Equation 2.2-4 — Equivalent Particle Diameter (Stokes' Law):

D = √(18 × η × L / (G_s − 1) × γ_w × t)

Where:

  • D = equivalent particle diameter (mm)
  • η = viscosity of water at test temperature (g/cm·s); at 68°F, η = 0.01002 g/cm·s
  • L = effective hydrometer depth (cm); varies with reading
  • G_s = specific gravity of solids (typically 2.65–2.72 for mineral soils; use measured value per ASTM D854)
  • γ_w = unit weight of water (g/cm³) = 1.0
  • t = elapsed time (minutes × 60 = seconds)

Note: Hydrometer particle sizes are usually reported in mm. The USCS does not separate silt from clay by size; it uses plasticity (the A-line on the plasticity chart). The 0.002 mm size is the clay-size boundary used by AASHTO and in the activity calculation.

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
ηviscosity of water at test temperature (g/cm·s)ConstantPhysical constant or standard value.project-specific
Leffective hydrometer depth (cm)Test setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific
Gsspecific gravity of solids (typically 2.65–2.72 for mineral soilsLab testSpecific gravity of solids (ASTM D854). 2.65–2.70 is usually adequate for mineral soils when untested.2.64–2.80 mineral; lower if organic · by USCS group
γwunit weight of water (g/cm³) = 1.0ConstantPhysical constant or standard value.project-specific
telapsed time (minutes × 60 = seconds)TimeElapsed test time (recorded) or the analysis time chosen for design.project-specific

Case study: 2.2.14.1 Gradings before and after compaction: the oversize that was never tested (Look 2023), in §8.14 Case Studies.

Case study: 2.2.14.2 Representative sampling from a weathered-rock stockpile (Look 2023), in §8.14 Case Studies.