The web apps and the Geotechnical Analysis Suite calculators and workbook guides for this chapter, gathered here from across the manual in the November 2026 restructure: 5 tools (0 interactive calculators). Where a tool applies to a particular section of this chapter it is also placed in that section in an orange tools strip. Each row lists the chapters and sections where the tool is used. Calculators open on dirtbert.com (sign-in required).
| Project Management & Checklists | |||
|---|---|---|---|
| PM | Cookbook ChecklistUsed in Chapter 3.9, 3.9.4 Boring Location Planning — Criteria by Project Type | guide only | Guide |
| PM | Project Book Data SheetUsed in Chapter 3.9, 3.9.4 Boring Location Planning — Criteria by Project Type | guide only | Guide |
| PM | Proposal ChecklistUsed in Chapter 3.9, 3.9.1 Background — Why Planning is a Billable Deliverable | guide only | Guide |
| PM | RR Project ChecklistUsed in Chapter 1.1, 1.1.10 Grade & Slope Stabilization Program — Roles and Process | guide only | Guide |
| Pavements, Subgrade & Frost | |||
| PV | Cookbook RailroadUsed in Chapter 2.3, 2.3.1 Background: The Railroad Track Structure | guide only | Guide |