A new box culvert and a lime-stabilized subgrade are planned in a gray clay with visible gypsum crystals. The laboratory reports water-soluble sulfate of 4,200 ppm in the clay at culvert level and 3,600 ppm in the subgrade samples.
| Variable | Value | Description |
|---|---|---|
| SO4 (culvert) | 4,200 ppm | Water-soluble sulfate in clay at culvert level |
| SO4 (subgrade) | 3,600 ppm | Highest value in the stabilization zone |
| Conversion | 1% = 10,000 ppm | Percent by mass to ppm |
| Exposure limits | Table 2.12-1 | Sulfate exposure classes |
| Lime limits | Table 2.12-2 | Sulfate heave risk bands |
The culvert is in exposure class S2 (high sulfate resistance, w/cm ≤ 0.45, f′c ≥ 4,500 psi). The subgrade is at moderate sulfate heave risk: ordinary lime stabilization is not suitable without extended mellowing or an alternative.
The culvert specification should name class S2 so that the precast supplier uses sulfate-resisting cement and the required water-cement ratio. Backfill around the culvert should not be lime- or cement-treated clay from the same deposit.
For the subgrade, the options are a lime application with 48 to 72 hours of mellowing at extra moisture before compaction, supported by a laboratory swell test on the actual soil, or a mechanical stabilization (geogrid and granular section) that avoids calcium altogether. Because sulfate in gypsiferous clay is patchy, more samples along the alignment are needed before choosing: a single 8,000 ppm pocket would rule out lime.