These problems share two features. First, they are invisible in an ordinary boring log: a gray clay with sulfate or a dark shale with pyrite looks the same as one without. Second, they are triggered by the project itself: by adding lime or cement, by placing concrete, or by exposing rock to air and water in a cut. The investigation has to test for them specifically, and the trigger is something the designer controls.