↑ Parent Menu⌂ Main Menu
← Chapter 2.12 Sulfates, Sulfides and Problem Mudrocks
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · open a dropdown to go to a section or subsection

2.12.5 Testing Program

Ground chemistry that attacks concrete, heaves stabilized subgrades and turns fresh shale into soil within a few seasons of exposure.
Author: Daniel P. Colwell
2.12.5 Testing Program
Table 2.12-4. Tests for chemically problematic ground
ConcernTestSample
Sulfate attack on concreteWater-soluble sulfate (soil); sulfate (water); pH; chlorideSoil at foundation and culvert levels; groundwater
Sulfate heave with lime or cementSoluble sulfate at close spacing; trial mix swell testSubgrade to depth of stabilization
Pyrite oxidationTotal and pyritic sulfur; acid-base accounting; paste pHDark shales, coal measures, organic clays
Mudrock durabilitySlake durability (ASTM D4644, withdrawn 2025); jar slake testFresh core from the cut
Corrosion of steelResistivity, pH, chloride, sulfateSoil and water at pile and anchor depths

These tests are inexpensive and are best added to the laboratory program from the start (Chapter 5.2), since resampling after a problem appears is costly.

← Previous · 2.0 The Underworld Chapter 2.11 — Soluble Ground and Karst: Sinkholes, Voids and Dissolution
Next · 2.0 The Underworld → Chapter 2.13 — Residual, Tropical and Arid Soils