↑ Parent Menu⌂ Main Menu
← Chapter 2.12 Sulfates, Sulfides and Problem Mudrocks
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · open a dropdown to go to a section or subsection

2.12.7 Cross-References

Ground chemistry that attacks concrete, heaves stabilized subgrades and turns fresh shale into soil within a few seasons of exposure.
Author: Daniel P. Colwell
2.12.7 Cross-References

Related chapters in this manual:

Related ICE Manual chapters are listed in the Further Reading box at the top of this chapter and in Appendix G.

← Previous · 2.0 The Underworld Chapter 2.11 — Soluble Ground and Karst: Sinkholes, Voids and Dissolution
Next · 2.0 The Underworld → Chapter 2.13 — Residual, Tropical and Arid Soils