| Fill | Relative density / consistency | Creep coefficient α (% per log cycle) | Notes |
|---|---|---|---|
| Well-graded granular, old | Medium dense | 0.2 to 0.5 | Settles little once aged |
| Sandy and silty fill, end-dumped | Loose to medium dense | 0.5 to 1.0 | Collapse-prone if dry (Chapter 2.9) |
| Clay fill, end-dumped | Soft to stiff, lumpy | 1.0 to 2.0 | Voids between clods close on wetting |
| Mixed fill with organics or debris | Variable | 2.0 to 5.0 or more | Decay continues to cause settlement |
| Cinders and slag | Loose | 0.5 to 1.5 | Some slags expand; check chemistry |
Strength parameters for fill should be chosen from tests on the fill itself, conservatively for loose and mixed zones. Do not assume that an old embankment that has stood for a century has a high factor of safety: many stand at factors close to 1.0 and fail when ditches are cleaned out at the toe, when water levels rise, or when the slope is loaded.