← Chapter 2.10 Non-Engineered Fills: Old Embankments, Waste and Made Ground
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · open a dropdown to go to a section or subsection

2.10.0 Purpose and Overview

Most of the railroad network sits on fill placed before modern compaction control. This chapter covers how to characterize it and how it behaves.
Author: Daniel P. Colwell
2.10.0 Purpose and Overview

A fill is engineered when its material, placement and compaction were specified and checked. Anything else is non-engineered, whatever its age or appearance. The distinction matters because engineered fill can be designed with predictable parameters, while non-engineered fill has to be investigated as a variable natural deposit, often more variable than the ground beneath it.

On a railroad, non-engineered fill includes the original embankments, the accumulated ballast and cinder section above them, widenings and siding fills added over the years, spoil from ditch cleaning cast on the shoulders, and fills placed over old trestles and timber culverts. Each has a different history and needs to be logged as its own unit.