↑ Parent Menu⌂ Main Menu
← Chapter 2.10 Non-Engineered Fills: Old Embankments, Waste and Made Ground
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · open a dropdown to go to a section or subsection

2.10.7 Cross-References

Most of the railroad network sits on fill placed before modern compaction control. This chapter covers how to characterize it and how it behaves.
Author: Daniel P. Colwell
2.10.7 Cross-References

Related chapters in this manual:

Related ICE Manual chapters are listed in the Further Reading box at the top of this chapter and in Appendix G.

Photograph credits

The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.

  1. Photo 2.10.1-1 — Rubblization using RMI Resonant Breaker. Photograph courtesy of Resonant Machines, Inc., 2005. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
  2. Photo 2.10.1-2 — Storrow Drive Connector, Boston Central Artery/Tunnel Project, Massachusetts. Photograph from EPA-530-K-05-002 (2005), courtesy of U.S. Environmental Protection Agency. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
  3. Photo 2.10.1-3 — Construction and demolition wastes to be processed at the Remex processing plant in Germany. From Schimmoller et al. (2000). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
  4. Photo 2.10.1-4 — Flowable fill used to backfill very narrow trenches. From ACCA (2003). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
  5. Photo 2.10.1-5 — Shredded tires being used as fill for highway embankment construction. From Stevens (2007). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
← Previous · 2.0 The Underworld Chapter 2.9 — Collapsible Soils: Identification, Testing and Railroad Impacts
Next · 2.0 The Underworld → Chapter 2.11 — Soluble Ground and Karst: Sinkholes, Voids and Dissolution