| Fill type | Description | Typical concerns |
|---|---|---|
| End-dumped embankment | Original earth fill tipped from the end of the grade, no lifts | Loose zones, segregation (coarse at toe), creep, internal shear surfaces |
| Sidehill cast fill | Material pushed or cast down a slope from a bench | Steep, loose outer shell on original slope; slides on the old ground surface |
| Trestle fill-in | Timber trestle buried in fill, often with timbers left in place | Decaying timber voids; sinkholes years later |
| Ballast and cinder section | Fouled ballast, cinders, slag and ballast pockets built up over a century | Water-holding pockets, fouling, frost, contamination (Chapter 5.4) |
| Widening fill | Later fill placed beside the original embankment | Differential settlement against the older, settled fill; poor bond on slope |
| Spoil and waste | Ditch spoil, dredge spoil, demolition debris, mine waste | Organics, loose structure, chemistry |
| Industrial waste | Slag, fly ash, foundry sand, mine tailings | Expansive slags, sulfates, leachate |





Old company valuation maps and track charts, aerial photographs and historical topographic maps often show where trestles were filled, where the line was relocated and where widenings were added. These records belong in the desktop study (Chapter 3.2).