Cross-References

Formerly Geo Rail Chapter 7.2 — Railway Geo-Hazard Risk Management

A systematic framework for identifying, assessing, and controlling landslide, hydraulic-erosion, and subsidence hazards along the active railway corridor.
Authors: Daniel P. Colwell and Mario Ruel
Cross-References
Related TopicChapter
Groundwater characterization, seepage, and piezometer monitoring behind hydraulic-erosion and subsidence hazardsChapter 2.8
Slope stability analysis and factor-of-safety methods underlying landslide risk scoringChapter 6.3
Seismic hazard and liquefaction assessment referenced by earthquake notification responseChapter 6.5
Ground improvement methods used as risk-control measures once a site enters mitigationSection 7.2.16 (7.2.16.1–7.2.16.45)
Retaining structures as a structural risk-control optionSee the Retaining Structures chapter (Chapter 7.1)
Railroad track subgrade failure modes referenced under subsidence hazardsChapter 2.3
Construction monitoring and instrumentation used during stabilization effectiveness reviewChapter 5.3
Geotechnical report preparation and documentation of risk-management decisionsChapter 8.4

Chapter 1.1 — Introduction to Railway Ground Hazard Risk Management

Primary Source: Geotechnology for Railroaders Program, Module 1; Keegan, Abbott & Ruel (2004), A Risk Management Framework for Ground Hazards Along Class I railways; CAN/CSA-Q850-97.

← Previous · 1.0 Introduction Chapter 1.0 — Manual Overview
Next · 2.0 The Underworld → Chapter 2.1 — Track Foundation Elements