Formerly Geo Rail Chapter 7.2 — Railway Geo-Hazard Risk Management
The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.
| ID | Correlation | Gives |
|---|---|---|
| RK-06 | Slope Mass Rating | SMR |
| RK-11 | Rockfall shadow angle | β (shadow) |
| RK-12 | Rockfall Hazard Rating System scoring | RHRS score |
| LS-01 | Reach angle (Fahrböschung) vs. volume — rock avalanches | H/L |
| LS-02 | Reach angle vs. volume — all landslide types | H/L |
| LS-03 | Debris-flow travel distance | L |
| LS-04 | Debris-flow peak discharge | Qₚ |
| LS-05 | Debris-flow inundation area (LAHARZ-type) | A, B |
| LS-07 | Landslide volume from area | V |
| LS-08 | Rainfall intensity–duration threshold (Caine) | I |
| LS-09 | Rainfall intensity–duration threshold (global update) | I |
| LS-10 | Newmark sliding displacement (regression) | Dₙ |