↑ Parent Menu⌂ Main Menu
← Chapter 1.1 Introduction to Railway Ground Hazard Risk Management
GHRM
Railway Ground Hazard Risk Management · 1.0 · Introduction
Sections · click a car to open it

1.1.4 Landslide Hazards

Formerly Geo Rail Chapter 7.2 — Railway Geo-Hazard Risk Management

A systematic framework for identifying, assessing, and controlling landslide, hydraulic-erosion, and subsidence hazards along the active railway corridor.
Authors: Daniel P. Colwell and Mario Ruel
1.1.4 Landslide Hazards

Typical risk rating: High. Rail lines in steep, geologically active terrain (mountainous western corridors are the classic case, though the same hazard families occur wherever the alignment cuts through active slopes) often run close to steep rock faces of poorer-quality rock, sometimes protected by rock sheds and post-and-wire rockfall warning systems that trigger an alarm so trains can slow and inspect for an obstruction. A dedicated rockfall hazard-and-risk assessment program (see Section 1.1.8) tracks and prioritizes rockslide-prone slopes at the scale of thousands of individual sites, continuously monitored.

Case Study — Rock Shed Collapse

Risk rating: Severe. Crews working near an active post-and-wire rockfall warning system observed rockfall activity above normal levels and shut the line down for the night as a precaution. The next morning, the rock shed was found crushed, with rock debris covering the entire track. Clearing crews began digging despite concern about a large overhanging rock they believed would hold — until it moved. Spotters can buy workers time to react, but predicting exactly when and how a slope will move remains extremely difficult; the loose rock was ultimately blasted to stabilize it before clearing could safely continue. Clearing the line took six days, with additional material continuing to fall throughout the excavation.

Takeaway: an active warning system and a conservative shutdown decision made the night before still did not prevent the shed's collapse. Zero risk is impossible; the goal of a risk-management program is proactive reduction of consequence and exposure, not elimination of hazard.

Debris flows (High). Debris flows accumulate high above the track over years as material builds up in a source area that is often not visible from track level; a storm event then releases the accumulated material downslope, and it can reach the track as far as one to two miles from where it originated. Because the source area is frequently hidden from the patroller's normal sightline, confirming what is actually happening upslope sometimes requires climbing to the source or an aerial overflight before a track-level event occurs.

Figure 1.1-17. A debris flow originating far above the visible track corridor.
Figure 1.1-17. A debris flow originating far above the visible track corridor.

Earth slides and embankment failures (High). Sensitive clay terrain produces a distinctive and dangerous hazard: retrogressive earthflows that begin beside a river or waterway and cascade into successive earthflows as the clay liquefies, often with very little precursor movement — capable of rapid, catastrophic failure over tens of feet of clay and taking track out of service for months at a time. Fissures on the flank and a head scarp are the early warning signs to watch for. Landslides are not limited to slopes below the track, either: a non-cohesive surficial failure can send mud pouring over the track from a slide originating above it, a reminder that uphill terrain deserves the same scrutiny as downhill terrain during patrol.

Figure 1.1-14. Anatomy of a landslide: head scarp, transverse and radial cracks, toe.
Figure 1.1-14. Anatomy of a landslide: head scarp, transverse and radial cracks, toe.
Supplemental reference

Field indicators for patrols and first responders

A landslide awareness handbook written for non-specialists lists warning signs that transfer directly to track patrol and roadmaster training:

  • New cracks or bulges in the ground or pavement; sunken or down-dropped roadbed; soil pulling away from foundations and structures.
  • Leaning poles, trees, walls or fences, and offset fence lines (bent trunks indicate creep).
  • Springs, seeps or saturated ground where it is normally dry; broken water lines or other buried utilities.
  • A rapid rise in creek level with increased turbidity, or a sudden drop in creek level while rain continues — the second can mean a slide or debris dam has blocked the channel upstream and may release.
  • Destabilizing changes: undercutting by streams, waves or excavation; loading of the upper slope; vegetation removal (the handbook cites up to a 90% reduction in stability for some slopes); and poor drainage.

Delayed failures are real. Geological Hazards notes that some English railroad cuts failed 60–70 years after excavation as slow creep progressed to failure. It recommends residual rather than peak strength for investigating or analyzing such slopes (see Chapter 6.3 for fully softened versus residual strength).

Volcanic and glacial outburst hazards. At Tangiwai, New Zealand (December 1953), the collapse of a crater-lake rim on Ruapehu sent a flood down the Whangaehu River that picked up debris and became a mudflow up to about 20 ft high. It struck a railroad bridge and partly carried it away, leading to the derailment of the Wellington–Auckland express and the loss of 151 lives. Upstream impoundments — crater lakes, glacial lakes, landslide dams and beaver ponds — belong in the corridor hazard inventory even when they are far from the track.

Source: Meyer, P. Landslide Hazard Manual — Trainer’s Handbook. Engineering for the World · Bolt, B. A., Horn, W. L., Macdonald, G. A. and Scott, R. F. (1977). Geological Hazards, 2nd ed. Springer-Verlag

Landslide case histories in photographs

Rock shed collapse, November 2012 (rated Severe). Crews working near a rock shed shut the line down for the night when a post-and-wire warning system showed more rockfall than usual. By the next morning the shed had been crushed and rock covered the track. Clearing took six days, more material fell as excavation proceeded, and an overhanging block that crews expected to hold eventually had to be blasted.

Figure 1.1-15. The rock shed and track before the November 2012 collapse.
Figure 1.1-15. The rock shed and track before the November 2012 collapse.
Figure 1.1-16. Clearing the shed debris beneath an overhanging block.
Figure 1.1-16. Clearing the shed debris beneath an overhanging block.

Debris flows start from material that builds up high in a drainage for years and is released by a storm. They can reach the track 1–2 miles from their source, which is often invisible from the track. Sensitive-clay earthflows in Eastern Canada retrogress from a riverbank with little warning; at St-Fabien about 80 ft of clay liquefied and the track was out of service for six months. Watch for fissures on the flanks and head scarp. At Qu’Appelle, Saskatchewan, a slide from above the track poured mud across it, so check uphill terrain as well as downhill.

Figure 1.1-18. Retrogressive earthflow scar in sensitive clay, Eastern Canada.
Figure 1.1-18. Retrogressive earthflow scar in sensitive clay, Eastern Canada.
Figure 1.1-19. Uphill slide at Qu’Appelle, Saskatchewan, depositing mud on the track.
Figure 1.1-19. Uphill slide at Qu’Appelle, Saskatchewan, depositing mud on the track.

After Geotechnology for Railroaders Program, Module 1; §06. Full reference under Supplemental References.

← Previous · 1.0 Introduction Chapter 1.0 — Manual Overview
Next · 2.0 The Underworld → Chapter 2.1 — Track Foundation Elements