Author and Sources

Formerly Geo Rail Chapter 7.2 — Railway Geo-Hazard Risk Management

A systematic framework for identifying, assessing, and controlling landslide, hydraulic-erosion, and subsidence hazards along the active railway corridor.
Authors: Daniel P. Colwell and Mario Ruel
Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

Primary sources

Supplemental references

  • Welsh, S. B. (2012). Geomorphic Changes Following Beaver Dam Failure and Abandonment. Plan B report, Utah State University (Table 5, modified from Butler and Malanson, 2005)Find source ↗Library entry
  • Ruel, M. (2008). MapInfo – BAHA Geo-hazard Inspection Instructions (helicopter inspection set-up and procedures)Find source ↗Library entry
  • Mine Subsidence Engineering Consultants (2007). Introduction to Longwall Mining and Subsidence, Rev. AFind source ↗
  • U.S. Energy Information Administration (1995). Longwall Mining. DOE/EIA-TR-0588Find source ↗
  • Meyer, P. Landslide Hazard Manual — Trainer’s Handbook. Engineering for the WorldFind source ↗
  • U.S. Army Corps of Engineers (1995). Coastal Geology. EM 1110-2-1810Official page ↗
  • Bolt, B. A., Horn, W. L., Macdonald, G. A. and Scott, R. F. (1977). Geological Hazards, 2nd ed. Springer-VerlagFind source ↗
  • Campos e Matos, A., Ribeiro e Sousa, L., Kleberger, J. and Lopes Pinto, P. (eds.) (2006). Geotechnical Risk in Rock Tunnels. Taylor & Francis/BalkemaFind source ↗
  • Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §9.3.3, §9.8, §9.9Find source ↗Library entry

File locations for these documents are listed under Supplemental References.

Project management sources

  • McKinnon, R. C. (2012). Safety Management: Near Miss Identification, Recognition, and Investigation. Boca Raton, FL: CRC Press (Taylor & Francis)Find source ↗
  • Cretu, O., Stewart, R. and Berends, T. (2011). Risk Management for Design and Construction. Hoboken, NJ: John Wiley & SonsFind source ↗
  • Sullivan, W. G., Wicks, E. M. and Koelling, C. P. (2015). Engineering Economy, 16th ed. Upper Saddle River, NJ: PearsonFind source ↗
  • Goldbloom, J. (1989). Engineering Construction Specifications: The Road to Better Quality, Lower Cost, Reduced Litigation. New York: Van Nostrand ReinholdFind source ↗Library entry
  • Haidar, A. D. (2016). Construction Program Management – Decision Making and Optimization Techniques. Cham, Switzerland: Springer International PublishingFind source ↗
  • Oberlender, G. D. (2000). Project Management for Engineering and Construction, 2nd ed. Boston: McGraw-HillFind source ↗
  • Levy, S. M. (2007). Project Management in Construction, 5th ed. New York: McGraw-HillFind source ↗
  • Bissonette, M. M. (2016). Project Risk Management: A Practical Implementation Approach. Newtown Square, PA: Project Management InstituteFind source ↗
  • Rad, P. F. (2002). Project Estimating and Cost Management. Vienna, VA: Management ConceptsFind source ↗
  • Chartered Institute of Building (2014). Code of Practice for Project Management for Construction and Development, 5th ed. Chichester, UK: John Wiley & SonsFind source ↗