↑ Parent Menu⌂ Main Menu
← Chapter 1.1 Introduction to Railway Ground Hazard Risk Management
GHRM
Railway Ground Hazard Risk Management · 1.0 · Introduction
Sections · click a car to open it

1.1.8 Purpose-Built Assessment Tools

Formerly Geo Rail Chapter 7.2 — Railway Geo-Hazard Risk Management

A systematic framework for identifying, assessing, and controlling landslide, hydraulic-erosion, and subsidence hazards along the active railway corridor.
Authors: Daniel P. Colwell and Mario Ruel
1.1.8 Purpose-Built Assessment Tools

Because a Class I network can carry on the order of a thousand or more individually tracked rockslope and beaver-dam sites, a workable R.M. program depends on standardized tools that convert field observations into comparable, prioritizable scores rather than ad hoc judgment calls. Four tools recur across the industry:

ToolPurpose
Rockfall Hazard & Risk AssessmentEvent-tree analysis assigning each catalogued rockslope a subjective probability of derailing a train; generates a derailment-hazard score used to prioritize and set inspection frequency across on the order of 1,000–1,500 tracked rockslopes
Beaver Activity Hazard Assessment (BAHA)Scores the potential for beaver activity to disrupt track serviceability from ponded-water volume, dam condition, topography, and the ability of infrastructure to handle a sudden release; guides dam removal, nuisance-beaver control, and anti-reconstruction devices
Earthquake Notification SystemReal-time link to a regional seismograph network; delivers immediate location/magnitude information to train control and specifies response actions (reduced speed or halt, pending field inspection) keyed to event magnitude
Weather Reporting & GISContracted forecasting with near-real-time and antecedent rainfall reporting; increasingly paired with radar precipitation data and soil-moisture modeling on a fine spatial grid to flag elevated runoff and saturation potential before a peril event arrives

An effective information-management system underpins all four: a relational database and GIS application maintaining a ground-hazard inventory across potentially thousands of sites, with each entry carrying site conditions, hazard type, potential trigger conditions, a subjective failure-rate and consequence assessment, the latest hazard/risk score, current priority, and proposed mitigation. This inventory is what makes the Preliminary Analysis and Risk Evaluation stages of the R.M. cycle (Section 1.1.2) repeatable rather than reinvented at every site.

Supplemental reference

Running a BAHA survey from the air

The BAHA inspection notes (Ruel, 2008) describe how the railroad's western territory was flown by helicopter with a GPS-linked laptop GIS, with a separate screen for back-seat observers:

  • Before the flight, build the base map: track and mileposts at minimum; the drainage network (1:20,000 or better); contours and access roads; culverts, bridges and crossings from the railway database; flight hazards (towers, power lines); watershed outlines from the existing BAHA database, or traced from contours and hydrology for new territory; and previously documented beaver dams.
  • In flight, record the helicopter track live, and for each subdivision draw a watershed region with a quick field rating (the map shades by threat level). Add beaver-dam hazard points, other hazard points, lines and areas with a severity rating and comments. Subdivision and milepost carry over automatically, and the work is saved often.
  • Afterwards, export the tables (dbf to Excel or Access) into the ground-hazard inventory described above. This keeps the rating repeatable from year to year and directly comparable with rockslope and other hazard scores.

Source: Ruel, M. (2008). MapInfo – BAHA Geo-hazard Inspection Instructions (helicopter inspection set-up and procedures)

Case study: 1.1.14.3 Regional landslide hazard zoning by GIS (Look 2023), in §1.1.14 Case Studies.

← Previous · 1.0 Introduction Chapter 1.0 — Manual Overview
Next · 2.0 The Underworld → Chapter 2.1 — Track Foundation Elements