Railway Ground Hazard Risk Management · 1.0 · Introduction
Sections · click a car to open it

1.1.5 Hydraulic Erosion Hazards

Formerly Geo Rail Chapter 7.2 — Railway Geo-Hazard Risk Management

A systematic framework for identifying, assessing, and controlling landslide, hydraulic-erosion, and subsidence hazards along the active railway corridor.
Authors: Daniel P. Colwell and Mario Ruel
1.1.5 Hydraulic Erosion Hazards

Typical risk rating: Elevated. Hydraulic hazards split first into surface erosion and underground (seepage) erosion, and secondarily by mechanism: stream and wave erosion, slope wash, gully erosion, piping, culvert erosion, channel aggradation/degradation, local and contraction scour, ice/log-debris jams, bank erosion, encroachment, avulsion, flooding, and beaver-dam failure. Two purpose-built risk-assessment tools track the highest-consequence versions of this category: a River Attack Risk Assessment for lateral stream migration and bank/pier attack, and a Beaver Activity Hazard Assessment for the beaver-related subset (see Section 1.1.8).

Figure 1.1-20. Lateral stream migration threatening the rail line.
Figure 1.1-20. Lateral stream migration threatening the rail line.

Scour — the action of flowing water eroding soil — deserves particular attention while patrolling: watch for it around river bends (where streambeds scour at the outer radius and deposit on the inside radius) and under piers, since scour can also trigger a landslide as a secondary event once the toe support at the base of a slope is removed.

Scour Protection Around Structures
Scour Protection Around Structures
Figure 1.1-22. River erosion and scour along the corridor: the outside of a bend scours, the inside deposits.
Figure 1.1-22. River erosion and scour along the corridor: the outside of a bend scours, the inside deposits.
Case Study — Bridge Pier Ice Damage

Risk rating: High. Ice buildup at a river bridge displaced an entire pier by one to two feet. The initial proposal — a large rock berm to stop the advancing ice — would have effectively dammed the river and caused significant environmental damage. The better solution, drilling through the piers and re-anchoring them into the underlying rock, avoided that impact entirely.

Figure 1.1-21. Ice jam and erosion at a rail bridge.
Figure 1.1-21. Ice jam and erosion at a rail bridge.

Takeaway: don't improvise a fix until the root cause is understood. A structurally obvious symptom (a displaced pier) can have a root cause (advancing river ice) whose most available fix (a berm) creates a worse secondary problem than the one it solves.

Supplemental reference

Beaver dam outbursts: the record behind the BAHA

Beaver ponds attenuate floods while they hold, but a failed dam releases the stored water at once. Welsh (2012, after Butler and Malanson, 2005) compiles documented failures. The railway cases show why the beaver assessment described in Section 1.1.8 exists:

Table 1-S1. Documented beaver-dam failures affecting railways and people (condensed)

EventConsequence
Williston, Vermont (reported 1984)Outwashed beaver dams damaged a drainage culvert and railroad embankment; Passenger train derailed — 5 killed, 149 injured
Nakina, Ontario (July 1992; TSB report R92T0183)Track-bed failure from sudden drawdown after a beaver dam failed; Class I freight derailed — 2 crew killed, 1 seriously injured
Central Michigan (reported 2003)Beaver dam collapse washed out a culvert under the railway; freight derailed, 2 employees injured
Oglethorpe County, Georgia (Butler, 1989)Outburst flood killed 4 people and floated a truck
Central Alberta, June 1994 (Hillman, 1998)Flood wave 3.5 times the maximum discharge recorded in 23 years; five downstream gauging stations destroyed

Two mechanisms recur: overtopping and washout of a culvert or fill by the outburst, and rapid drawdown of a pond impounded against the embankment, which leaves the fill saturated with its external support removed (Chapter 6.3, Section 6.3.8).

Source: Welsh, S. B. (2012). Geomorphic Changes Following Beaver Dam Failure and Abandonment. Plan B report, Utah State University (Table 5, modified from Butler and Malanson, 2005)

Supplemental reference

Coastal and lakeshore bluff recession

Lines along the Great Lakes, New England and the Pacific run on or behind eroding bluffs. USACE EM 1110-2-1810 reports average U.S. shoreline erosion of about 1.3 ft/yr (Atlantic 2.6 ft/yr; Gulf 6 ft/yr, up to 14 ft/yr in Louisiana; Pacific essentially stable where the shore is hard rock). Cliff retreat is significant in the Great Lakes, Pacific, New England and New York. On cohesive (clay or till) shores, erosion is irreversible: waves abrade and cut down the nearshore clay, which lets larger waves reach the toe, and the bluff steepens and slumps (Figure 1-S2). A thin sand cover can accelerate abrasion, but once the sand becomes thick enough it protects the clay and recession stops. Where waves remove toe debris faster than it accumulates, the bluff retreats quickly with a steep face. Higher lake levels are expected to accelerate Great Lakes recession, while California cliff retreat is episodic and driven by severe winter storms, runoff and groundwater. For risk scoring, estimate the time until the recession line reaches the track, not just the current setback; for protection options, see revetment design in Chapter 7.1.

Relationship between downcutting of cohesive material in the nearshore and bluff recession (from Nairn, 1992).
Supplemental Figure 1-S2. Relationship between downcutting of cohesive material in the nearshore and bluff recession (from Nairn, 1992). Source: U.S. Army Corps of Engineers (1995). Coastal Geology. EM 1110-2-1810, p. 4-57.

Source: U.S. Army Corps of Engineers (1995). Coastal Geology. EM 1110-2-1810

Hydraulic hazards: bank migration, ice and scour

The hydraulic inventory tracked includes surface runoff, stream and wave erosion, underground flow, slope wash, gullying, seepage, piping, erosion around culverts, aggradation and degradation, local and contraction scour, ice and log jams, bank erosion, encroachment, avulsion, flooding and beaver dams. Scour can also trigger a landslide as a secondary event.

Pier displacement near Quebec City (rated High). Ice buildup moved an entire pier 1–2 ft. The first proposal, a large rock berm against the ice, would have dammed the river. Instead the piers were drilled and re-anchored into rock. The lesson: do not improvise a fix before the root cause is understood.

After Geotechnology for Railroaders Program, Module 1; §07. Full reference under Supplemental References.

Case study: 1.1.14.1 St Lucia riverbank slide: back-analysis gives probabilities, and the repair length (Look 2023), in §1.1.14 Case Studies.