Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After UFC 4-860-01FA (2004)” draw on item S11 and are rewritten for railroad clients. Blocks marked “After Selig & Waters (1994)” summarize item S12 for railroad clients; tables are condensed from the book and its figures are not reproduced. The Case Studies section summarizes case studies from item S13 by Burt G. Look; its figures are reproduced from the book for internal reference use, and the closing “For railroad work” note in each case study is added by the authors of this manual. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.
- Welsh, S. B. (2012). Geomorphic Changes Following Beaver Dam Failure and Abandonment. Plan B report, Utah State University (Table 5, modified from Butler and Malanson, 2005)Find source ↗Library entry
- Ruel, M. (2008). MapInfo – BAHA Geo-hazard Inspection Instructions (helicopter inspection set-up and procedures)Find source ↗Library entry
- Mine Subsidence Engineering Consultants (2007). Introduction to Longwall Mining and Subsidence, Rev. AFind source ↗
- U.S. Energy Information Administration (1995). Longwall Mining. DOE/EIA-TR-0588Find source ↗
- Meyer, P. Landslide Hazard Manual — Trainer’s Handbook. Engineering for the WorldFind source ↗
- U.S. Army Corps of Engineers (1995). Coastal Geology. EM 1110-2-1810Find source ↗
- Bolt, B. A., Horn, W. L., Macdonald, G. A. and Scott, R. F. (1977). Geological Hazards, 2nd ed. Springer-VerlagFind source ↗
- Campos e Matos, A., Ribeiro e Sousa, L., Kleberger, J. and Lopes Pinto, P. (eds.) (2006). Geotechnical Risk in Rock Tunnels. Taylor & Francis/BalkemaFind source ↗
- Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
- Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
- U.S. Army Corps of Engineers, Naval Facilities Engineering Command and Air Force Civil Engineer Support Agency (2004). UFC 4-860-01FA, Railroad Design and Rehabilitation. Unified Facilities Criteria, 16 January 2004 (supersedes TI 850-02, 1 March 2000); approved for public release, distribution unlimited. Used on this page: ch. 5 (§6)Find source ↗Library entry
- Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: chs. 1, 8, 15 and 16Find source ↗Library entry
- Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. Leiden: CRC Press/Balkema (Taylor & Francis). ISBN 978-1-032-10470-6. Case studies used on this page: §9.3.3, §9.8, §9.9Find source ↗Library entry
- McKinnon, R. C. (2012). Safety Management: Near Miss Identification, Recognition, and Investigation. Boca Raton, FL: CRC Press (Taylor & Francis). Used on this page for project-management materialFind source ↗
- Cretu, O., Stewart, R. and Berends, T. (2011). Risk Management for Design and Construction. Hoboken, NJ: John Wiley & Sons. Used on this page for project-management materialFind source ↗
- Sullivan, W. G., Wicks, E. M. and Koelling, C. P. (2015). Engineering Economy, 16th ed. Upper Saddle River, NJ: Pearson. Used on this page for project-management materialFind source ↗
- Goldbloom, J. (1989). Engineering Construction Specifications: The Road to Better Quality, Lower Cost, Reduced Litigation. New York: Van Nostrand Reinhold. Used on this page for project-management materialFind source ↗Library entry
- Haidar, A. D. (2016). Construction Program Management – Decision Making and Optimization Techniques. Cham, Switzerland: Springer International Publishing. Used on this page for project-management materialFind source ↗
- Oberlender, G. D. (2000). Project Management for Engineering and Construction, 2nd ed. Boston: McGraw-Hill. Used on this page for project-management materialFind source ↗
- Levy, S. M. (2007). Project Management in Construction, 5th ed. New York: McGraw-Hill. Used on this page for project-management materialFind source ↗
- Bissonette, M. M. (2016). Project Risk Management: A Practical Implementation Approach. Newtown Square, PA: Project Management Institute. Used on this page for project-management materialFind source ↗
- Rad, P. F. (2002). Project Estimating and Cost Management. Vienna, VA: Management Concepts. Used on this page for project-management materialFind source ↗
- Chartered Institute of Building (2014). Code of Practice for Project Management for Construction and Development, 5th ed. Chichester, UK: John Wiley & Sons. Used on this page for project-management materialFind source ↗