2.13.4 Arid and Semi-Arid Soils

Soils formed in place by weathering, and soils shaped by dry climates: why the usual sedimentary-soil rules do not fit them.
Author: Daniel P. Colwell
2.13.4 Arid and Semi-Arid Soils
Table 2.13-2. Arid soil features and their engineering significance
FeatureDescriptionSignificance
Caliche (calcrete)Calcium carbonate cemented layers near the surface, from weak nodules to hard rock-like capsHigh strength and hard excavation when dry; can mask loose or collapsible soil beneath; variable thickness
Desiccated crustsDry, stiff, fissured upper claysOverstate strength in summer; swell and soften on wetting
Collapsible fans and debris flowsLoose, dry, clay-bonded silts and sandsCollapse on wetting (Chapter 2.9)
Sabkha and salt flatsSaline, often loose and soft, with crusts of salt and gypsumDissolution, corrosion, sulfate attack, very low strength when wet
Expansive claysClays that remain dry most of the yearLarge seasonal and wetting-induced heave (Chapter 2.5)
Flash floodingEphemeral washes with intense short stormsScour of culverts and bridge foundations; debris flows

In arid ground the controlling variable is water, and water usually comes from the railroad: a culvert that concentrates flow, a ditch that ponds, or irrigation or development beside the corridor. The same soil that has supported track for decades can collapse, swell or dissolve when water is introduced, so drainage design is as important as foundation design. Erosion and scour in washes are covered with the hydraulic hazards in Chapter 1.1.