Intense weathering in hot, wet climates produces laterites (iron- and aluminum-rich soils that can harden on exposure into ironstone), halloysite and allophane clays with very high natural water content but good strength, and black cotton soils (highly expansive montmorillonite clays) in seasonally wet-dry areas. Their natural water contents and liquid limits can look alarming while the soil performs well, and drying in the laboratory changes their properties irreversibly. Classification tests on tropical soils should be run without oven drying the sample first, and the drying method reported. These soils are rare on mainland North American railroads but matter for work in the Caribbean, Central America, Hawaii and the Pacific islands.