This chapter groups three soil families that share one lesson: the standard correlations between index properties, blow counts and engineering parameters were not derived for them and should be used with caution. Residual soils carry inherited structure from the parent rock; tropical soils add intense chemical weathering; arid soils add cementation, desiccation and salts. Each is described below with its railroad implications.