A residual profile grades from soil at the surface to fresh rock at depth, with no sharp boundary. Practice in the southeastern United States uses a small number of zones defined largely by SPT resistance and the presence of relict structure.
| Zone | Description | Typical SPT N (bpf) | Excavation |
|---|---|---|---|
| Residual soil | Completely weathered; no relict structure; often red to brown sandy clay or clayey silt | 4 to 15 | Common excavation |
| Saprolite | Weathered in place; relict foliation, veins and joints visible; micaceous sandy silt or silty sand | 10 to 60, increasing with depth | Common excavation |
| Partially weathered rock (PWR) | Transition zone of soil-like and rock-like material | ≥ 100 bpf (sampler advance ≤ 6 in. per 50 blows) | Ripping or light blasting |
| Weathered to fresh rock | Rock core recovery; RQD increases with depth | Auger refusal | Blasting |
The depth to each zone varies sharply over short distances, following the parent rock's mineralogy and jointing: boulders of fresh rock can sit in saprolite, and deep weathered slots can cut into rock. Borings define the profile at points only; rippability and refusal depths should be presented as ranges, and geophysics (seismic refraction or MASW) is useful between borings.