↑ Parent Menu⌂ Main Menu
← Chapter 2.6 Peats and Organic Soils: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.6.0 Executive Summary

Peat and organic soil are mostly water held in plant remains. They are the weakest and most compressible ground a railroad crosses: they settle for decades through secondary compression, carry little load, and keep moving long after the fill is placed.
Author: Daniel P. Colwell
2.6.0 Executive Summary

Organic soils contain enough decomposed plant matter to change their engineering behavior. Organic silts and clays (USCS OL and OH) have roughly 5% to 30% organic content; peat (PT) is mostly organic matter, usually more than 50% by dry weight, and can hold 5 to 15 times its dry weight in water.

The engineering problems are:

  • Very large settlement. Peat can compress 20% to 50% of its thickness under a few feet of fill, much of it as secondary compression that continues for decades.
  • Low strength. Undrained strength is typically 100 to 500 psf, so fills fail by bearing or sliding unless they are built slowly or supported.
  • Low and variable track modulus. Track over peat deflects more under load, so ballast, ties and rail deteriorate faster and track geometry is hard to hold.
  • Lateral spreading and bog bursts. Fill placed on peat squeezes it sideways; older lines often sit on fill that has punched deep into the bog.
  • Changes with time and drainage. Lowering the water table lets peat oxidize and shrink; acidic water corrodes steel and concrete.

This chapter gives typical values, equations and design options for organic soils and peat. First-pass values are also listed in Appendix D, Section D.5.

Use of the values in this chapter. Peat properties vary over short distances and with fiber content, decomposition and depth. Values here are for screening and preliminary design; site testing governs.
← Previous · 2.0 The Underworld Chapter 2.5 — Clays: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.7 — Rock and Sand: Properties, Typical Values and Behavior