↑ Parent Menu⌂ Main Menu
← Chapter 2.6 Peats and Organic Soils: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

Author and Sources

Peat and organic soil are mostly water held in plant remains. They are the weakest and most compressible ground a railroad crosses: they settle for decades through secondary compression, carry little load, and keep moving long after the fill is placed.
Author: Daniel P. Colwell
Author and Sources

Author: Daniel P. Colwell. This chapter was written and compiled by Daniel P. Colwell for Railway Ground Hazard Risk Management from the published sources below; credit for that material belongs to their authors and publishers. It contains no client- or project-specific data.

Sources

  • Edil, T. B. and den Haan, E. J. (1994). “Settlement of Peats and Organic Soils.” Vertical and Horizontal Deformations of Foundations and Embankments, ASCE GSP 40Find source ↗
  • FHWA (2017). Ground Modification Methods Reference Manual, GEC 13, FHWA-NHI-16-027/028Find source ↗
  • Holtz, R. D., Kovacs, W. D. and Sheahan, T. C. (2011). An Introduction to Geotechnical Engineering, 2nd ed. PearsonFind source ↗
  • Landva, A. O. and Pheeney, P. E. (1980). “Peat Fabric and Structure.” Canadian Geotechnical Journal, 17(3)Find source ↗
  • MacFarlane, I. C. (ed.) (1969). Muskeg Engineering Handbook. University of Toronto PressFind source ↗
  • Mesri, G. and Godlewski, P. M. (1977). J. Geotech. Eng. Div., 103(GT5)Find source ↗
  • Mesri, G., Stark, T. D., Ajlouni, M. A. and Chen, C. S. (1997). “Secondary Compression of Peat with or without Surcharging.” J. Geotech. Geoenviron. Eng., 123(5)Find source ↗
  • Mesri, G. and Ajlouni, M. (2007). “Engineering Properties of Fibrous Peats.” J. Geotech. Geoenviron. Eng., 133(7)Find source ↗
  • ASTM D1997, D2487, D2974, D4427, D2435Official page ↗

Photograph credits

The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.

  1. Photo 2.6.6-1 — Typical GEOTERRA Mat Layouts — including the Material Specification table and Unit Dimensions diagram. Presto Geosystems, GEOTERRA–A1.DWG. Source: Presto Geosystems product literature (GEOWEB® / GEOTERRA®).
  2. Photo 2.6.6-2 — GEOTERRA System Components — PadLoc® Connection Device detail, Earth Anchor detail, and system cross-section. Presto Geosystems, GEOTERRA–B1.DWG. Source: Presto Geosystems product literature (GEOWEB® / GEOTERRA®).
  3. Photo 2.6.6-3 — GEOTERRA Design Guidelines — five typical cross-section designs, from Design 1 (units and connection device only) up to Design 5 (units, drainage cell, and dual high-strength/non-woven geotextile layers), with their typical applications. Presto Geosystems, GEOTERRA–C1.DWG. Source: Presto Geosystems product literature (GEOWEB® / GEOTERRA®).
  4. Photo 2.6.6-4 — Torsion Tool. Photographer not stated in the source. Source: Presto Geosystems product literature (GEOWEB® / GEOTERRA®).
  5. Photo 2.6.6-5 — Earth Anchor Drive Rod. Photographer not stated in the source. Source: Presto Geosystems product literature (GEOWEB® / GEOTERRA®).
  6. Photo 2.6.6-6 — Earth Anchor Set Tool. Photographer not stated in the source. Source: Presto Geosystems product literature (GEOWEB® / GEOTERRA®).
  7. Photo 2.6.6-7 — GEOTERRA Pre-Assembled Mats for Truck/Container Transportation — connecting pre-assembled mat sections with connector units, plus mat laying dimensions. Presto Geosystems, GEOTERRA–D1.DWG. Source: Presto Geosystems product literature (GEOWEB® / GEOTERRA®).
  8. Photo 2.6.6-8 — Completed Ringtrac® geotextile encased sand column. (Photograph courtesy of Huesker, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  9. Photo 2.6.6-9 — Ringtrac® geotextile encased sand columns at Mühlenberger Loch. (Photograph courtesy of Huesker, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  10. Photo 2.6.6-10 — VCC vibratory rig. (Photograph courtesy of James Collin.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  11. Photo 2.6.6-11 — Full view of vibratory rig. (Photograph courtesy of James Collin.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  12. Photo 2.6.6-12 — VCC installation. (Photograph courtesy of James Collin.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  13. Photo 2.6.6-13 — Successive installation of VCCs. (Photograph courtesy of James Collin.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  14. Photo 2.6.6-14 — Withdrawal of vibratory probe during VCC installation. (Photograph courtesy of James Collin.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
← Previous · 2.0 The Underworld Chapter 2.5 — Clays: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.7 — Rock and Sand: Properties, Typical Values and Behavior