2.6.8 Summary of Equations

Peat and organic soil are mostly water held in plant remains. They are the weakest and most compressible ground a railroad crosses: they settle for decades through secondary compression, carry little load, and keep moving long after the fill is placed.
Author: Daniel P. Colwell
2.6.8 Summary of Equations
Table 2.6-8: Equations for Organic Soils in This Chapter
Eq.QuantityExpressionUse and limits
22-1Saturated unit weightγsat = Gs(1 + w)γw/(1 + wGs)Gas lowers actual value
22-2Compression indexCc ≈ 0.0115 wn (organic); 0.01 wn (peat)Screening
22-3Primary and secondary settlementSp = H Cc/(1+e0) log(σ′f/σ′0); Ss = H Cα/(1+ep) log(t/tp)Thin sublayers; large-strain check
22-4Fill height on peatHmax = 5.14 su/(γ FS)Wide fill, undrained
22-5Net added stressΔσnet = Σγh (new) − γh (removed)Compensated and lightweight fill