| Material | w (%) | γ (pcf) | su (psf) | φ′ design (deg) | Cc/(1+e0) | Cα/(1+ep) | k (ft/day) |
|---|---|---|---|---|---|---|---|
| Organic silt (OL) | 40–100 | 90–105 | 200–600 | 28–32 | 0.15–0.25 | 0.008–0.015 | 0.0003–0.03 |
| Organic clay (OH) | 60–200 | 85–100 | 150–500 | 25–30 | 0.20–0.35 | 0.01–0.02 | 0.0003–0.003 |
| Amorphous (sapric) peat | 200–600 | 62–75 | 100–400 | 28–35 | 0.30–0.50 | 0.015–0.03 | 0.003–0.3 |
| Fibric peat | 500–1,500 | 58–68 | 100–300 | 30–40 | 0.35–0.60 | 0.02–0.04 | 0.3–30 |
Starting values only; replace with test data.