↑ Parent Menu⌂ Main Menu
← Chapter 2.6 Peats and Organic Soils: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.6.5 Shear Strength

Peat and organic soil are mostly water held in plant remains. They are the weakest and most compressible ground a railroad crosses: they settle for decades through secondary compression, carry little load, and keep moving long after the fill is placed.
Author: Daniel P. Colwell
2.6.5 Shear Strength

Peat strength is low and difficult to measure. Fibers act as reinforcement, so laboratory friction angles of 40° to 60° are commonly measured in fibric peat, but those values are not usable directly in stability analysis because the strain needed to mobilize them is far larger than the fill can tolerate.

Table 2.6-6: Typical Strength Parameters of Organic Soils and Peat
ParameterOrganic silt/clayAmorphous peatFibric peat
Undrained strength, su (psf), natural ground150–600100–400100–300 (field vane; often unreliable)
su/σ′v0 (normally consolidated)0.25–0.350.3–0.50.3–0.6
Effective friction angle, φ′ (deg), design25–3228–3530–40 (laboratory values higher)
Sensitivity, St2–52–52–10

Ranges compiled from Mesri and Ajlouni (2007), Edil and den Haan (1994) and Landva and Pheeney (1980). The strength ratio of peat is commonly reported higher than that of inorganic clay; confirm for each site with field vane and laboratory tests.

Bearing check for fill on peat

Hmax = 5.14 suγfill FS

Eq. 2.6-4 (wide fill, undrained; same form as Eq. 2.5-10)

  • With su = 200 psf, γfill = 120 pcf and FS = 1.3, Hmax ≈ 6.6 ft. Most fills on peat therefore need staged construction, berms, reinforcement or lightweight fill.
  • Strength increases quickly as peat consolidates because its strength ratio is high and fibric peat drains fast; staged construction with short hold periods works well when monitored with piezometers.
  • The field vane in fibric peat can be distorted by fibers; correct and interpret with care, and use CPTu and back-analysis of trial fills where possible.
← Previous · 2.0 The Underworld Chapter 2.5 — Clays: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.7 — Rock and Sand: Properties, Typical Values and Behavior