↑ Parent Menu⌂ Main Menu
← Chapter 2.6 Peats and Organic Soils: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.6.12 Peat and Organic Soil Investigation and Design Checklist

Peat and organic soil are mostly water held in plant remains. They are the weakest and most compressible ground a railroad crosses: they settle for decades through secondary compression, carry little load, and keep moving long after the fill is placed.
Author: Daniel P. Colwell
2.6.12 Peat and Organic Soil Investigation and Design Checklist

Checklist · Part X · Problem Soils

Peat and Organic Soil Investigation and Design Checklist

Investigation0 of 5
Laboratory Testing0 of 5
Analysis and Design0 of 5
Construction and Reporting0 of 4
Ticks are saved in this browser.
← Previous · 2.0 The Underworld Chapter 2.5 — Clays: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.7 — Rock and Sand: Properties, Typical Values and Behavior