2.6.9 Worked Examples
Peat and organic soil are mostly water held in plant remains. They are the weakest and most compressible ground a railroad crosses: they settle for decades through secondary compression, carry little load, and keep moving long after the fill is placed.
The examples use generic sites and are not taken from any client project. Example 2.6-1 estimates the settlement of a track widening over peat; Example 2.6-2 shows how much lightweight fill reduces it. Each is laid out as Given, Required, Equations, a flow chart of the steps with a spot check at each, and the Solution.
Example 2.6-1: Settlement of a Track Widening Over Peat
A second track will be built beside a main line that crosses a bog. The existing track has sat on its fill for decades and has already consolidated the peat beneath it; the new track has not. The settlement under the new track is therefore almost all differential settlement between two tracks that must stay level with each other.
Given and required for Example 2.6-1.
Given
Variable
Value
Description
Existing fill
4 ft, γ = 120 pcf
Low fill under the widening
Peat
10 ft amorphous peat, γ = 65 pcf, over dense sand
Compressible layer
zw
At the top of the peat
Water table
Δσ
4 ft × 120 pcf = 480 psf
New fill
Cc/(1 + e0)
0.45
Compression ratio of the peat
Cα/Cc
0.06
Secondary to primary ratio
tp
About 1 year
End of primary consolidation
t
30 years
Design life for secondary settlement
Required
Primary and secondary settlement under the new track
Whether the differential is acceptable
Equations
Eq. 1: σ′v0 = Σ γh above the water table + Σ (γ − γw)h below — effective stress at mid-peat
Eq. 2.6-3b: Ss = H [Cα/(1 + ep)] log(t/tp) — secondary settlement
Steps
Step 1 · σ′v0 at mid-peat (Eq. 1)
4(120) + 5(65 − 62.4) = 480 + 13
σ′v0 = 493 psf
Spot check: The submerged peat adds only 2.6 pcf per foot; nearly all the effective stress comes from the fill.
↓
Step 2 · Primary settlement (Eq. 2.6-3a)
10 × 0.45 × log(973/493) = 4.5 × 0.295
Sp = 1.33 ft (16 in.)
↓
Step 3 · Secondary ratio
Cα/(1 + ep) ≈ 0.06 × 0.45
0.027
↓
Step 4 · Secondary settlement, 1 to 30 years (Eq. 2.6-3b)
10 × 0.027 × log 30 = 0.27 × 1.48
Ss = 0.40 ft (5 in.)
↓
Step 5 · Total
16 + 5
About 21 in. under the new track
↓
Solution
About 21 in. under the new track; almost none under the old.
Solution
About 16 in. of primary and 5 in. of secondary settlement, about 21 in. in all, under the new track and almost none under the existing one.
That differential is not acceptable for parallel tracks. One layer is used here for illustration; peat compresses so much that a design calculation should use 2-ft sublayers, which usually gives a somewhat smaller total. Example 2.6-2 shows the first step toward reducing it.
Example 2.6-2: Lightweight Fill to Limit Settlement
Settlement on peat is driven by the added stress, so the most direct control is to add less weight. This example repeats Example 2.6-1 with lightweight aggregate in place of soil fill.
Given and required for Example 2.6-2.
Given
Variable
Value
Description
Site
As Example 2.6-1
σ′v0 = 493 psf; H = 10 ft; Cc/(1 + e0) = 0.45
γLWA
55 pcf
Expanded shale lightweight aggregate
h
4 ft
New fill thickness
Required
Added stress and primary settlement with lightweight fill
Spot check: About half of Example 2.6-1, though the stress is less than half, because settlement follows the logarithm of the stress ratio.
↓
Solution
Sp = 9 in., about half of the soil-fill case.
Solution
Primary settlement falls to about 9 in., roughly half of Example 2.6-1. Secondary settlement continues at the same rate.
Lightweight aggregate alone does not bring the differential to an acceptable level. Further reduction needs EPS geofoam, with enough soil and ballast cover to resist buoyancy and spread the wheel load, or column support. The choice depends on the track outage available and the settlement tolerance between the tracks.