2.6.3 Typical Index and Physical Properties

Peat and organic soil are mostly water held in plant remains. They are the weakest and most compressible ground a railroad crosses: they settle for decades through secondary compression, carry little load, and keep moving long after the fill is placed.
Author: Daniel P. Colwell
2.6.3 Typical Index and Physical Properties
Table 2.6-4: Typical Properties of Organic Soils and Peat
PropertyOrganic silt/clay (OL/OH)Sapric (amorphous) peatFibric peat
Organic content (%)5–3050–7575–98
Natural water content, w (%)40–200200–600500–1,500
Bulk unit weight, γ (pcf)85–10562–7558–68
Specific gravity, Gs2.30–2.651.6–2.01.4–1.7
Initial void ratio, e01.5–54–108–20
Liquid limit (natural sample)40–150150–500Not meaningful
Permeability, k (ft/day), initial0.0003–0.030.003–0.30.3–30 (falls by 100 to 1,000 times under load)
pH5–74–63.5–6

Ranges compiled from Mesri and Ajlouni (2007), Edil and den Haan (1994), MacFarlane (1969) and Landva and Pheeney (1980).

Water content and unit weight

Below the water table peat is close to saturated, so its unit weight is barely above that of water (62.4 pcf). The effective stress in a peat layer is therefore very small: under 10 ft of peat with the water table at the surface, the effective stress at the base is only about 25 to 125 psf. That is why even a few feet of fill increases the effective stress many times over and causes large settlement.

γsat = Gs (1 + w) γw1 + w Gs

Eq. 2.6-1 (saturated soil; w as a decimal)

For fibric peat with Gs = 1.5 and w = 800%, Eq. 2.6-1 gives γsat ≈ 65 pcf. Gas from decomposition often keeps peat below full saturation, so measure the unit weight of samples rather than computing it.