Peat forms where plant growth outpaces decay in permanently wet ground: bogs, fens, marshes and muskeg. Organic silts and clays form in quiet water with organic input: estuaries, oxbow lakes and backswamps.
| Deposit | Typical setting | Railroad experience |
|---|---|---|
| Muskeg and bog peat | Canadian Shield, northern Minnesota, Wisconsin and Michigan, Maine, Alaska | Lines built across bogs on log corduroy or brush mats; continued settlement and repeated raising with ballast and fill |
| Coastal and estuarine organic clay and peat | Atlantic and Gulf coasts, Florida, Louisiana, Pacific Northwest | Long bridge approaches and causeways; slow settlement of approach fills |
| Floodplain organic silt and backswamp deposits | Mississippi and other large river valleys | Soft organic layers within alluvium; differential settlement at bridges |
| Buried peat lenses | Glacial terrain, old lake and pond basins | Unexpected soft spots found by track defects; often missed between borings |
| Organic fill and topsoil left under old embankments | Older lines built without stripping | Long-term settlement and soft shoulders |
Track over peat typically shows a long, irregular sag that needs repeated surfacing, low track modulus and visible pumping of the track structure under passing trains. Older embankments over bogs can be many times thicker than they appear because decades of raising have driven fill into the peat.