2.6.2 Identification and Classification

Peat and organic soil are mostly water held in plant remains. They are the weakest and most compressible ground a railroad crosses: they settle for decades through secondary compression, carry little load, and keep moving long after the fill is placed.
Author: Daniel P. Colwell
2.6.2 Identification and Classification
Table 2.6-2: Classification by Organic Content (ASTM D2974 ash content)
Organic content (% of dry mass)ClassificationUSCS
< 5Mineral soil with organic tracesNormal group with “with organic” descriptor
5–30Organic silt or organic clayOL (LL < 50) or OH (LL ≥ 50)
30–75Very organic soil or sapric (amorphous) peatPT or OH
> 75PeatPT

USCS identifies organic silt and clay by the liquid limit of the oven-dried sample being less than 0.75 times that of the natural sample (ASTM D2487). Organic content is measured by loss on ignition at 824°F (440°C) (ASTM D2974).

Table 2.6-3: Peat Classification by Fiber Content (ASTM D4427)
Peat typeFiber content (% by dry mass)DescriptionEngineering behavior
Fibric> 67Least decomposed; plant structure visibleHigh permeability initially; high apparent friction; very large but rapid primary compression
Hemic33–67Partly decomposedIntermediate
Sapric< 33Most decomposed; amorphous, smoothLow permeability; behaves like organic clay; slower consolidation

Fiber content per ASTM D1997. The von Post humification scale (H1 to H10) is a field equivalent: H1–H3 fibric, H4–H6 hemic, H7–H10 sapric.

Field identification

Organic soils are dark brown to black, have a distinct odor (often hydrogen sulfide in coastal deposits), feel spongy, and change color on exposure to air. Peat floats or nearly floats in water when dried. Probing with a steel rod or a hand vane is the fastest way to map peat thickness between borings.