↑ Parent Menu⌂ Main Menu
← Chapter 8.4 Geotechnical Report Preparation
GHRM
Railway Ground Hazard Risk Management · 8.0 · Reporting
Sections · click a car to open it

Supplemental References

Formerly Geo Rail Chapter 5.3 — Geotechnical Report Preparation

The geotechnical report is the primary contract deliverable.
Authors: Daniel P. Colwell and Mario Ruel
Supplemental References

Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S7 for railroad clients; tables are condensed from the book and its figures are not reproduced. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.

  1. Federal Highway Administration (2017). What is a Geotechnical Report? Geotechnical Engineering fact pageFind source ↗
  2. A consultant (2018). Preliminary Site Assessment of Slope Instability at a main-line milepost, a Class I railroad subdivision, near Clarksburg, WV (draft letter report, April 6, 2018)Find source ↗
  3. A Class I railroad (2016). Standard Specifications for Private Sidetracks (Industrial Sidetrack Manual), September 15, 2016Find source ↗
  4. A Class I railroad (2020). Public Projects Manual, December 2020, incl. Soil and Water Management PolicyFind source ↗
  5. Rao, V. V. S. (2016). “Guidelines for Forensic Investigation of Geotechnical Failures,” and Jessep, R. A., de Mello, L. G. and Rao, V. V. S. (2016). “Technical Shortcomings Causing Geotechnical Failures: Report of Task Force 10, TC 302.” In Rao and Sivakumar Babu (eds.), Forensic Geotechnical Engineering. Springer IndiaFind source ↗Library entry
  6. Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
  7. Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: chs. 12, 14 and 16Find source ↗Library entry
  8. Levy, S. M. (2007). Project Management in Construction, 5th ed. New York: McGraw-Hill. Used on this page for project-management materialFind source ↗
  9. Twort, A. C., and Rees, J. G. (2004). Civil Engineering Project Management, 4th ed. Oxford: Elsevier Butterworth-Heinemann. Used on this page for project-management materialFind source ↗
  10. Goldbloom, J. (1989). Engineering Construction Specifications: The Road to Better Quality, Lower Cost, Reduced Litigation. New York: Van Nostrand Reinhold. Used on this page for project-management materialFind source ↗Library entry
  11. Haidar, A. D. (2016). Construction Program Management – Decision Making and Optimization Techniques. Cham, Switzerland: Springer International Publishing. Used on this page for project-management materialFind source ↗
  12. ASCE Construction Institute Committee on Specifications (L. Eckersley, Chair) (2013). Preparation of Construction Specifications for Civil Projects. Reston, VA: American Society of Civil Engineers. Used on this page for project-management materialFind source ↗
  13. Spain, B. (1995). Taking Off Quantities: Civil Engineering. London: E & FN Spon. Used on this page for project-management materialFind source ↗
  14. Oberlender, G. D. (2000). Project Management for Engineering and Construction, 2nd ed. Boston: McGraw-Hill. Used on this page for project-management materialFind source ↗
  15. Hutchings, J. F. (2004). Project Scheduling Handbook. Civil and Environmental Engineering Series, Vol. 15. New York: Marcel Dekker, Inc.. Used on this page for project-management materialFind source ↗
  16. Bissonette, M. M. (2016). Project Risk Management: A Practical Implementation Approach. Newtown Square, PA: Project Management Institute. Used on this page for project-management materialFind source ↗
  17. American Society of Civil Engineers (2012). Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, 3rd ed. ASCE Manuals and Reports on Engineering Practice No. 73. Reston, VA: ASCE. Used on this page for project-management materialFind source ↗
  18. Federal Highway Administration (1991). Rock Blasting and Overbreak Control. Publication FHWA-HI-92-001, National Highway Institute Course 13211. Washington, DC: FHWA. Used on this page: Section 8.4.7Find source ↗
  19. U.S. Office of Surface Mining Reclamation and Enforcement. 30 CFR 816.61–816.68, Use of Explosives (airblast limits 816.67(b); ground vibration limits, scaled distance and blasting-level chart 816.67(d)). Used on this page: Section 8.4.7Open source ↗
← Previous · 8.0 Reporting Chapter 8.3 — Memorandums
Next · Appendices → Appendices