↑ Parent Menu⌂ Main Menu
← Chapter 8.4 Geotechnical Report Preparation
GHRM
Railway Ground Hazard Risk Management · 8.0 · Reporting
Sections · click a car to open it

8.4.5 Laboratory Data Tables

Formerly Geo Rail Chapter 5.3 — Geotechnical Report Preparation

The geotechnical report is the primary contract deliverable.
Authors: Daniel P. Colwell and Mario Ruel
8.4.5 Laboratory Data Tables
8.4.5.1 Required Table Format

Present lab results in a single master table (Appendix B) with:

Tests for Soil
Tests for Soil
ColumnDescription
Boring IDBoring identifier
Sample IDSample number and type
Depth (ft)Top and bottom of sample interval
USCSUnified classification symbol
LL / PL / PIAtterberg limits
% FinesPercent passing No. 200 sieve
γ_d (pcf)Dry unit weight from Proctor or shelby tube
w (%)Natural water content
s_u (tsf)Undrained shear strength (UU triaxial or vane)
c' (psf), φ' (°)Effective strength parameters (CU/CD triaxial)
C_c / C_rCompression indices (consolidation test)
c_v (ft²/day)Coefficient of consolidation
σ'_p (tsf)Preconsolidation pressure
k (ft/day)Hydraulic conductivity
CBR (%)California Bearing Ratio
NotesTest method, remarks

Completeness: Every sample assigned a lab test on the investigation plan (Chapter 3.9, Section 3.9.7) must appear in the table, even if the result is "not tested" due to sample disturbance, with a note explaining why.

← Previous · 8.0 Reporting Chapter 8.3 — Memorandums
Next · Appendices → Appendices