Empirical Equations — Use and Limitations

Formerly Geo Rail Chapter 5.3 — Geotechnical Report Preparation

The geotechnical report is the primary contract deliverable.
Authors: Daniel P. Colwell and Mario Ruel
Empirical Equations — Use and Limitations

The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.

IDCorrelationGives
IS-01SPT energy & procedure correctionN₆₀
IS-02SPT overburden normalization (sands)(N₁)₆₀
IS-07Undrained shear strength of clay from SPTSᵤ