Formerly Geo Rail Chapter 5.3 — Geotechnical Report Preparation
Checklist · Part XI · Appendix
ASCE (2012) describes the design professional’s quality control as a plan that evolves with the project rather than a single check at the end. A typical project-specific design QC plan provides enough experienced staff; communication with the owner on priorities and within the design team; confirmation of field conditions, codes, standards and safety conditions that affect the design; preparation, review and coordination of drawings, estimates and specifications; scheduled reviews, audits and progress reporting; and specialty advisers on construction and maintenance who are not on the day-to-day team.
The QC focus changes by phase. In pre-design the parties agree on the QC plan. In schematic design the designer studies alternatives and the owner accepts a schematic design report. In design development alternatives and costs are refined, stakeholders such as regulators comment, and once the design development report is approved the design is “frozen.” In the contract documents phase QC includes detailed checking of computations, drawings and quantity take-offs, review of pay items and specifications, and constructability review. During bidding, the designer must correct ambiguities and errors that bidders identify before bids are due.
The Manual distinguishes the routine checking every design team does (dimensions, notes, cross-references, drawing–specification conflicts) from design reviews and audits. A design review is internal QC by team members and an experienced review board. A design audit is done by people outside the design team: an independent technical review if by others in the same firm, or an external peer review if by an unaffiliated organization. External peer review is recommended for complex, controversial, or high-risk projects. The Manual notes that owners and designers usually hold at least a final review at about 90% design completion.
For railroad work: Build the report checklist around these milestones: confirm the investigation scope against the project phase, check calculations independently (boring-depth, bearing, settlement, slope stability) before recommendations are written, reconcile the report’s quantities and pay items with the GSP and plan sheets, and hold a 90% review with the railroad’s engineering staff before sealing. Record who checked what and when, so the QC trail is part of the project file.
Source: American Society of Civil Engineers (2012). Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, 3rd ed. ASCE Manuals and Reports on Engineering Practice No. 73. Reston, VA: ASCE, pp. 193–196. Summarized and paraphrased. Full reference under Supplemental References.
Pre-Drafting
Report Drafting
Pre-Submittal
Post-Submittal