↑ Parent Menu⌂ Main Menu
← Chapter 8.4 Geotechnical Report Preparation
GHRM
Railway Ground Hazard Risk Management · 8.0 · Reporting
Sections · click a car to open it

8.4.15 Report Preparation Checklist

Formerly Geo Rail Chapter 5.3 — Geotechnical Report Preparation

The geotechnical report is the primary contract deliverable.
Authors: Daniel P. Colwell and Mario Ruel
8.4.15 Report Preparation Checklist

Checklist · Part XI · Appendix

Report Preparation Checklist

Pre-Drafting0 of 6
Report Drafting0 of 8
Pre-Submittal0 of 7
Post-Submittal0 of 6

ASCE (2012) describes the design professional’s quality control as a plan that evolves with the project rather than a single check at the end. A typical project-specific design QC plan provides enough experienced staff; communication with the owner on priorities and within the design team; confirmation of field conditions, codes, standards and safety conditions that affect the design; preparation, review and coordination of drawings, estimates and specifications; scheduled reviews, audits and progress reporting; and specialty advisers on construction and maintenance who are not on the day-to-day team.

The QC focus changes by phase. In pre-design the parties agree on the QC plan. In schematic design the designer studies alternatives and the owner accepts a schematic design report. In design development alternatives and costs are refined, stakeholders such as regulators comment, and once the design development report is approved the design is “frozen.” In the contract documents phase QC includes detailed checking of computations, drawings and quantity take-offs, review of pay items and specifications, and constructability review. During bidding, the designer must correct ambiguities and errors that bidders identify before bids are due.

The Manual distinguishes the routine checking every design team does (dimensions, notes, cross-references, drawing–specification conflicts) from design reviews and audits. A design review is internal QC by team members and an experienced review board. A design audit is done by people outside the design team: an independent technical review if by others in the same firm, or an external peer review if by an unaffiliated organization. External peer review is recommended for complex, controversial, or high-risk projects. The Manual notes that owners and designers usually hold at least a final review at about 90% design completion.

For railroad work: Build the report checklist around these milestones: confirm the investigation scope against the project phase, check calculations independently (boring-depth, bearing, settlement, slope stability) before recommendations are written, reconcile the report’s quantities and pay items with the GSP and plan sheets, and hold a 90% review with the railroad’s engineering staff before sealing. Record who checked what and when, so the QC trail is part of the project file.

Source: American Society of Civil Engineers (2012). Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, 3rd ed. ASCE Manuals and Reports on Engineering Practice No. 73. Reston, VA: ASCE, pp. 193–196. Summarized and paraphrased. Full reference under Supplemental References.

Ticks are saved in this browser.
Plain text version

Pre-Drafting

  • [ ] All boring logs reviewed and approved by responsible PE
  • [ ] All laboratory test data quality-checked (chains of custody verified, QC split results acceptable)
  • [ ] All calculations reviewed internally; no unresolved discrepancies between data and analysis
  • [ ] Client naming convention and file format confirmed
  • [ ] PE sealed by appropriate state-licensed Professional Engineer
  • [ ] Peer review performed (high-speed passenger corridor: independent PE; other clients: internal senior review)

Report Drafting

  • [ ] Executive summary written using PREP method (after all analysis complete)
  • [ ] All referenced figures generated (location map, boring plan, geologic profiles)
  • [ ] Boring log header fields complete (all 9 required items)
  • [ ] Laboratory data master table complete (all samples; no blank cells without explanation)
  • [ ] All recommendations in Section 8 include governing parameter, source section, and caveat
  • [ ] Limitations clause included verbatim (or per client template)
  • [ ] GSP draft attached as Appendix D
  • [ ] Calculation appendix organized per Section 8.4.8; each subsection has header block

Pre-Submittal

  • [ ] All figures numbered and titled; all tables numbered and titled
  • [ ] Table of contents accurate and paginated
  • [ ] All cross-references verified (e.g., "see Figure 3" exists and is correct)
  • [ ] File naming per Section 8.4.10.2 convention; revision number and date correct
  • [ ] PDF/A format verified where the owner railroad requires it
  • [ ] PE seal applied to all required pages (cover page, boring logs, calculations)
  • [ ] Transmittal form prepared per client protocol (ProjectWise, BIM 360, or email)

Post-Submittal

  • [ ] Transmittal receipt confirmed from client
  • [ ] Review period calendared (see Table 8.4-1 for turnaround times by client)
  • [ ] Comment-Response Matrix template prepared; ready to receive comments
  • [ ] All comments addressed in writing; no comments silently ignored
  • [ ] Final revision re-submitted with Comment-Response Matrix attached
  • [ ] "Issued for Construction" (Rev03 or final) confirmed with client PE before construction
← Previous · 8.0 Reporting Chapter 8.3 — Memorandums
Next · Appendices → Appendices