Formerly Geo Rail Chapter 5.3 — Geotechnical Report Preparation
Professional Engineer Seal Requirements vary by owner railroad. Confirm them against the owner railroad's current standards when the work is scoped, and record the edition used.
Digital PE Seal: Owner railroads accept a digitally applied PE seal (per applicable state board rules) on PDF documents provided the seal meets state board digital signature standards. A scanned wet-seal image is not a digital seal — confirm with state board.
Multi-state projects: When a project crosses a state line (Class I railroad southeast subdivision crossing Georgia/Tennessee, for example), the PE must be licensed in both states, or two PEs must co-seal (one per state). Confirm this with the client project engineer before the report is finalized.