Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
Primary sources
Supplemental references
- Federal Highway Administration (2017). What is a Geotechnical Report? Geotechnical Engineering fact pageFind source ↗
- A consultant (2018). Preliminary Site Assessment of Slope Instability at a main-line milepost, a Class I railroad subdivision, near Clarksburg, WV (draft letter report, April 6, 2018)Find source ↗
- A Class I railroad (2016). Standard Specifications for Private Sidetracks (Industrial Sidetrack Manual), September 15, 2016Find source ↗
- A Class I railroad (2020). Public Projects Manual, December 2020, incl. Soil and Water Management PolicyFind source ↗
- Rao, V. V. S. (2016). “Guidelines for Forensic Investigation of Geotechnical Failures,” and Jessep, R. A., de Mello, L. G. and Rao, V. V. S. (2016). “Technical Shortcomings Causing Geotechnical Failures: Report of Task Force 10, TC 302.” In Rao and Sivakumar Babu (eds.), Forensic Geotechnical Engineering. Springer IndiaFind source ↗Library entry
File locations for these documents are listed under Supplemental References.
Project management sources
- Levy, S. M. (2007). Project Management in Construction, 5th ed. New York: McGraw-HillFind source ↗
- Twort, A. C., and Rees, J. G. (2004). Civil Engineering Project Management, 4th ed. Oxford: Elsevier Butterworth-HeinemannFind source ↗
- Goldbloom, J. (1989). Engineering Construction Specifications: The Road to Better Quality, Lower Cost, Reduced Litigation. New York: Van Nostrand ReinholdFind source ↗Library entry
- Haidar, A. D. (2016). Construction Program Management – Decision Making and Optimization Techniques. Cham, Switzerland: Springer International PublishingFind source ↗
- ASCE Construction Institute Committee on Specifications (L. Eckersley, Chair) (2013). Preparation of Construction Specifications for Civil Projects. Reston, VA: American Society of Civil EngineersFind source ↗
- Spain, B. (1995). Taking Off Quantities: Civil Engineering. London: E & FN SponFind source ↗
- Oberlender, G. D. (2000). Project Management for Engineering and Construction, 2nd ed. Boston: McGraw-HillFind source ↗
- Hutchings, J. F. (2004). Project Scheduling Handbook. Civil and Environmental Engineering Series, Vol. 15. New York: Marcel Dekker, Inc.Find source ↗
- Bissonette, M. M. (2016). Project Risk Management: A Practical Implementation Approach. Newtown Square, PA: Project Management InstituteFind source ↗
- American Society of Civil Engineers (2012). Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, 3rd ed. ASCE Manuals and Reports on Engineering Practice No. 73. Reston, VA: ASCEFind source ↗