8.4.10 Electronic Deliverables and Version Control

Formerly Geo Rail Chapter 5.3 — Geotechnical Report Preparation

The geotechnical report is the primary contract deliverable.
Authors: Daniel P. Colwell and Mario Ruel
8.4.10 Electronic Deliverables and Version Control
8.4.10.1 File Format Requirements
Table 8.4-4. Electronic Deliverable Formats by Client
DeliverableClass IClass IClass IClass IClass IPassengerClass IShort line
Main ReportPDF/APDF/APDF/APDF/APDF/APDF/APDF/APDF
Boring LogsPDFPDFPDFPDFPDFPDFPDFPDF
CAD Drawing (boring plan)DWG 2018DWG 2018DWG 2020DWG 2020DWG 2020DWG 2020DWG 2018DWG/PDF
CalculationsPDF + sourcePDF + ExcelPDF + MathCADPDF + ExcelPDF + sourcePDF + sourcePDF + sourcePDF
GSPDOCX + PDFDOCX + PDFDOCX + PDFDOCX + PDFDOCX + PDFDOCX + PDFDOCX + PDFPDF
Lab DataPDF + CSVPDF + CSVPDF + CSVPDF + CSVPDF + CSVPDF + CSVPDF + CSVPDF
GPR DataInterpreted PDFInterpreted PDFFull dataset + PDFFull dataset + PDFFull dataset + PDFFull dataset + PDFFull dataset + PDFPDF only
8.4.10.2 Version Control Naming Convention

Recommended file naming convention (compatible with all client document management systems):

[ClientCode]_[ProjectNo]_GeoRpt_[DocumentType]_Rev[##]_[YYYYMMDD].pdf

Example:

RR_00-0000_GeoRpt_MainReport_Rev01_20260515.pdf

RR_00-0000_GeoRpt_BoringLogs_Rev01_20260515.pdf

RR_00-0000_GeoRpt_Calculations_Rev01_20260515.pdf

Revision tracking:

  • Rev00 = Issued for Internal Review (not transmitted to client)
  • Rev01 = Issued for Client Review (first submittal)
  • Rev02 = Issued for Client Review (after comment resolution)
  • Rev03 = Issued for Construction (final, PE-sealed)

Include a revision history table on the cover page showing revision number, date, description of changes, and PE initials for each revision.

8.4.10.3 Comment Resolution Log

When the client returns review comments:

  1. Compile all comments into a Comment-Response Matrix (Word or Excel)
  2. Each row: Comment No. | Source | Section Ref. | Comment Text | Response | Revised Section Reference
  3. Responses must be one of: "Revised as requested" | "Revised, see [section]" | "Not revised — see explanation"
  4. Disagreements with client comments must be escalated to the client project engineer in writing — never silently not incorporated
  5. Return the Comment-Response Matrix with the next revision submittal

Owner railroads may require the Comment-Response Matrix to be submitted in their project management portal (for example, Procore or BIM 360) with each revision.