8.4.12 Representative Report Outline

Formerly Geo Rail Chapter 5.3 — Geotechnical Report Preparation

The geotechnical report is the primary contract deliverable.
Authors: Daniel P. Colwell and Mario Ruel
8.4.12 Representative Report Outline

The following outline covers the usual content of a GDR/FGR; check it against the owner railroad's requirements:

COVER PAGE

TABLE OF CONTENTS

LIST OF FIGURES

LIST OF TABLES

1.0 EXECUTIVE SUMMARY

2.0 INTRODUCTION

2.1 Project Description

2.2 Scope of Investigation

2.3 Report Organization

3.0 SITE CONDITIONS

3.1 Location and Access

3.2 Topography and Drainage

3.3 Existing Structures and Track

3.4 Published Geologic References

4.0 FIELD INVESTIGATION

4.1 Boring Program

4.2 Drilling Methods

4.3 Sampling and Testing

4.4 Groundwater Observations

5.0 LABORATORY TESTING

5.1 Program Summary

5.2 Results Overview (detail in Appendix B)

6.0 SUBSURFACE CONDITIONS

6.1 Geologic Setting

6.2 Stratigraphy and Soil/Rock Description

6.3 Engineering Properties Summary Table

6.4 Groundwater Conditions

7.0 ENGINEERING ANALYSES

7.1 Foundation Bearing Capacity

7.2 Settlement Analysis

7.3 Slope Stability (if applicable)

7.4 Seismic Hazard and Liquefaction (if applicable)

7.5 Track Subgrade Evaluation (if applicable)

7.6 Ground Improvement (if applicable)

8.0 CONCLUSIONS AND RECOMMENDATIONS

9.0 LIMITATIONS AND CONDITIONS OF USE

FIGURES

Fig. 1 Site Location Map

Fig. 2 Boring Location Plan

Fig. 3 Geologic Profile (along alignment)

Fig. 4 Geologic Profile (cross-section)

Fig. 5 Instrumentation Plan (if applicable)

APPENDIX A BORING LOGS

APPENDIX B LABORATORY TEST DATA

APPENDIX C CALCULATIONS

APPENDIX D GEOTECHNICAL SPECIAL PROVISIONS

APPENDIX E FIELD EXPLORATION PHOTOGRAPHS

Project management · Oberlender (2000)

Design Proposals and “Mini-Drawings” as a Budgeting Tool

Oberlender’s chapter on design proposals is written for the design-side project manager, who must turn a sponsor’s request for proposal into an engineering scope, a work-hour budget and a schedule. The key steps:

  • Lock the assumed scope. Where the RFP is vague and the sponsor cannot clarify it, define the scope as well as you can, budget it, and document the assumptions back to the sponsor. When better information arrives, that portion is re-priced.
  • Discipline detail sheets. Each discipline lead converts the project definition into a discipline scope, a specification list and a preliminary drawing list. With the discipline manager, the lead estimates work-hours by personnel category. The project manager then adds project management, clerical and reproduction hours.
  • Mini-drawings. These are quick hand sketches on letter-size sheets, one for each full-size sheet expected in the final set, in final order, with plans, sections and details blocked out. They give an early sheet count, show the expertise needed, support the work-hour estimate, and later serve as drafting assignments and a progress record.
  • Sanity checks. Compare drawings per facility, hours per drawing, design cost as a percentage of construction cost, and expected duration against past projects. Confirm that the people in the budget will actually be available.
  • Contingency. The most common error in design schedules is leaving no allowance for permit delays, client review time and slow responses to information requests.

He also recommends budgeting design in work-hours rather than dollars, because hours are what drive design.

For railroad work: The “mini-drawing” translates directly into a mini-report, a one-page-per-item dummy of the geotechnical report. List each figure (site location, boring location plan, subsurface profile along the track centerline, cross-sections at each repair station, stability output sheets), each appendix (boring logs, lab summary, calculations, GSPs) and each table, and assign estimated hours to every item. Building this dummy from the report outline in this appendix during the proposal makes the sheet and figure count visible. It also exposes scope the client may not have priced, such as a second cross-section for a slide that extends past the original limits, and gives a ready basis for the client-review allowance and the peer-review hours required under I.11.

Source: Oberlender, G. D. (2000). Project Management for Engineering and Construction, 2nd ed. Boston: McGraw-Hill, pp. 118–134. Summarized and paraphrased. Full reference under Supplemental References.