Formerly Geo Rail Chapter 5.3 — Geotechnical Report Preparation
The following outline covers the usual content of a GDR/FGR; check it against the owner railroad's requirements:
COVER PAGE
TABLE OF CONTENTS
LIST OF FIGURES
LIST OF TABLES
1.0 EXECUTIVE SUMMARY
2.0 INTRODUCTION
2.1 Project Description
2.2 Scope of Investigation
2.3 Report Organization
3.0 SITE CONDITIONS
3.1 Location and Access
3.2 Topography and Drainage
3.3 Existing Structures and Track
3.4 Published Geologic References
4.0 FIELD INVESTIGATION
4.1 Boring Program
4.2 Drilling Methods
4.3 Sampling and Testing
4.4 Groundwater Observations
5.0 LABORATORY TESTING
5.1 Program Summary
5.2 Results Overview (detail in Appendix B)
6.0 SUBSURFACE CONDITIONS
6.1 Geologic Setting
6.2 Stratigraphy and Soil/Rock Description
6.3 Engineering Properties Summary Table
6.4 Groundwater Conditions
7.0 ENGINEERING ANALYSES
7.1 Foundation Bearing Capacity
7.2 Settlement Analysis
7.3 Slope Stability (if applicable)
7.4 Seismic Hazard and Liquefaction (if applicable)
7.5 Track Subgrade Evaluation (if applicable)
7.6 Ground Improvement (if applicable)
8.0 CONCLUSIONS AND RECOMMENDATIONS
9.0 LIMITATIONS AND CONDITIONS OF USE
FIGURES
Fig. 1 Site Location Map
Fig. 2 Boring Location Plan
Fig. 3 Geologic Profile (along alignment)
Fig. 4 Geologic Profile (cross-section)
Fig. 5 Instrumentation Plan (if applicable)
APPENDIX A BORING LOGS
APPENDIX B LABORATORY TEST DATA
APPENDIX C CALCULATIONS
APPENDIX D GEOTECHNICAL SPECIAL PROVISIONS
APPENDIX E FIELD EXPLORATION PHOTOGRAPHS
Oberlender’s chapter on design proposals is written for the design-side project manager, who must turn a sponsor’s request for proposal into an engineering scope, a work-hour budget and a schedule. The key steps:
He also recommends budgeting design in work-hours rather than dollars, because hours are what drive design.
For railroad work: The “mini-drawing” translates directly into a mini-report, a one-page-per-item dummy of the geotechnical report. List each figure (site location, boring location plan, subsurface profile along the track centerline, cross-sections at each repair station, stability output sheets), each appendix (boring logs, lab summary, calculations, GSPs) and each table, and assign estimated hours to every item. Building this dummy from the report outline in this appendix during the proposal makes the sheet and figure count visible. It also exposes scope the client may not have priced, such as a second cross-section for a slide that extends past the original limits, and gives a ready basis for the client-review allowance and the peer-review hours required under I.11.
Source: Oberlender, G. D. (2000). Project Management for Engineering and Construction, 2nd ed. Boston: McGraw-Hill, pp. 118–134. Summarized and paraphrased. Full reference under Supplemental References.